range of application | Production pipeline |
Material | pe |
Advantage | economy of materials |
Technological flow of the polyurethane coating steel preinsulated pipe equipment:
1. Remove rust from steel pipe surface
2. Heat the steel pipe to get it ready for polyurethane spraying
3. Spray polyurethane evenly on steel pipe outer surface
4. Wrap melted HDPE strap around the PU foam
5. Trim the pipe ends
Spray cooling: The semi-finished pipe wrapped with the polyethylene outer coating is cooled by an online spray device. The polyethylene outer coating tightly wraps the polyurethane insulation layer on the steel pipe/piece to complete the production of the polyethylene outer coating.
Reasonable structure computer control, automatic adjustment of process parameters high stability
Rust removal of steel pipe/piece, the hydraulic lifting mechanism is used to transport the steel pipe/piece to the transmission pipe conveying line of the steel pipe shot blasting cleaning line, and the steel pipe/piece is turned and entered the shot blasting room. When the signal of the steel pipe/piece is collected by the internal sensor, the control system commands the shot gate to open, and the pellets are thrown against the outer wall of the steel pipe to remove the rust and impurities attached to the outer wall of the steel pipe. The steel pipe workpiece enters the output roller table, and after shot blasting, the outer surface of the steel pipe workpiece meets the requirements of sa2.5.