Specifications
Brand Name :
HUASHIDA
Certification :
ISO9001
Place of Origin :
Qingdao,Shandong,China
MOQ :
1
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time :
come to an agreement in respect of the delivery time
Packaging Details :
Packing according to Machine
Condition :
New
Pipe Material :
Steel
Material :
PE/PUR
Heating Method :
Electric heating
Foaming Material :
Polyurethane
Warranty :
1 Year
Foaming Method :
Spraying
Description

Preinsulated Pipe Making Machine for PU Spraying PE Film Wrapping 2-Step Method


Product description
Vacuum calibrating method pre-insulated pipe outside casing extrusion line is the most advanced and popular machinery in the world. HSD brand absorbs the advanced technology from German and improve to meet development. Especially compared with internal pressure method, Vacuum calibrating method is much better than it for stiffness, pressure resistance and surface smooth.

Pipe structure

Rigid polyurethane spraying polyethylene winding prefabricated directly buried insulation pipe consists of steel working pipe, spraying polyurethane rigid foam insulation layer and winding polyethylene outer protective pipe. See the following figure for product structure

Technological flow:

Technological flow of the polyurethane coating steel preinsulated pipe equipment:

1. Remove rust from steel pipe surface

2. preheat the steel pipe to get it ready for polyurethane spraying

3. Spray polyurethane evenly on steel pipe outer surface

4. Wrap melted HDPE strap around the PU foam

5. Trim the pipe ends

Features of the polyurethane spraying PE winding insulation pipe

(1). Density, thermal conductivity, compressive strength and other indices of the polyurethane insulation layer are uniform and consistent. Therefore overall performance of the pipe is superior.
(2). The polyurethane insulation layer is formed by free foaming. Since polyurethane is foamed perpendicular to the axial direction of the pipe, compressive strength of the insulation layer is improved.
(3). The polyurethane insulation layer is formed after spraying. The raw materials are sprayed onto the outer surface of the steel pipe in a liquid form, and then begins to foam. Due to the high reaction activity of the spraying polyurethane raw materials, adhesion between steel pipe surface and polyurethane foam layer is stronger.
(4).Roughness of the surface of polyurethane foam layer is more conducive to increase bonding effect between insulation layer and outer HDPE protective layer.
(5). Polyurethane insulation layer can be sprayed according to the thickness required by customers with a thickness of 15-20mm. Costs can be significantly saved.
(6). Prefabricated directly buried insulation pipes produced using the "spray winding" process, with polyurethane insulation layer and polyethylene outer protective layer thickness adjustable according to users needs. The production process does not require additional molds and tooling, making it simple and easy to operate. Due to the absence of expansion stress on the polyethylene outer protective layer during foaming in the "spray winding" process, thickness of the polyethylene outer protective layer can be relatively thinner, reducing costs for customers.
(7). The polyethylene outer protective layer is formed by circumferential winding, therefore circumferential elongation and tensile strength are significantly improved. Circumferential strength of polyethylene protective layer is stronger.
(8). As this is a completely automatic production line, Production speed is improved and production quality is consistent and superior.


Other supplier racks

The integrated welded structure, without adjustment devices, cannot be installed when the ground is uneven. The height of the stand cannot be adjusted, resulting in uneven rolling of steel pipes on the stand, too fast rolling, or difficult rolling, which poses a safety hazard.

Main accessories

Item Standard value Tested value
Pipe diameter DN300-DN1620
OD contraction rate <=2% 1.46
Radial shear strength 0.12(23±2ºC)MPa
0.08(140±2ºC)MPa
0.14
0.09
Shock strength (-20ºC, 3Kg, hammer falls from 2 meters high) No visible cracks OK
Peak Operating temperature 140ºC 150ºC
Continuous operating temperature 120ºC 140ºC
Service life 30 years OK
Preinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step MethodPreinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step MethodPreinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step MethodPreinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step MethodPreinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step Method
Send your message to this supplier
Send Now

Preinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step Method

Ask Latest Price
Watch Video
Brand Name :
HUASHIDA
Certification :
ISO9001
Place of Origin :
Qingdao,Shandong,China
MOQ :
1
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time :
come to an agreement in respect of the delivery time
Contact Supplier
video
Preinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step Method
Preinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step Method
Preinsulated Pipe Making Machine For PU Spraying PE Film Wrapping 2 Step Method

Qingdao Huashida Machinery Co., Ltd.

Verified Supplier
2 Years
shandong, qingdao
Since 2003
Business Type :
Manufacturer
Total Annual :
3000000-5000000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement