Specifications
Brand Name :
Huashida
Certification :
ISO9001
Place of Origin :
Qingdao,Shandong,China
MOQ :
1
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time :
2months
Packaging Details :
according to the actual condition
Length :
36m,40m,48m
Production Scope :
Product Line
Automatic Production Line :
Comprehensive
Pipe Uasge :
Pre-insualte
Description

110-550mm PE Insulation Pipe Extrusion Line,Automatic tube cutting

gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery

Technical Prameters:

PE-365/760 PE-420/960 PE-850/1372 PE-960/1680
Main extruder SJ-90/33 SJ-90/33 SJ-120/33 SJ-150/33
Pipe diameter (mm) Φ365-960 Φ420-960 Φ850-1372 Φ960-1680
capacity (kg/h) 550-700 550-700 700-900 800-1200
Installed power (kw) 360 380 440 580
Length (m) 35 36 40 48

The huashida insulation pipe production line boasts a core technology that stands at the forefront of China's industry. It showcases numerous innovative points and design concepts, effectively bridging gaps in domestic capabilities. Notably, four pioneering core technologies—the solid-liquid phase separation screw, spiral diverter head, DCL human-machine dialogue technology, and real box external manipulator technology—are either the first or among the earliest implemented in the sector. This groundbreaking product stands as the sole domestic production line capable of producing 1880mm large-diameter insulation pipes, further solidifying its position as a leader in the field.


Outside Casing Extrusion Equipment For Natural Gas Pipeline High Efficiency

HDPE Jacket Process Flow:

  1. Vacuum Feeding of PE Granules: The raw PE granules are automatically fed into the system via vacuum suction.
  2. Hot Air Drying: The granules are dried using hot air to remove moisture, ensuring optimal extrusion quality.
  3. Extrusion Plasticizing: The dried granules are plasticized through the extruder, heated and mixed to form a molten plastic mass.
  4. Mold Shaping: The molten plastic is shaped into the desired pipe profile by passing through the extrusion die.
  5. Vacuum Sizing: The pipe is then subjected to vacuum sizing, adjusting its dimensions to precise specifications.
  6. Water Cooling: The pipe is cooled rapidly by immersion in a water tank to solidify its shape and structure.
  7. Pulling Out: The solidified pipe is pulled out of the cooling tank at a controlled speed.
  8. Cutting: The pipe is cut to the desired length using a precision cutting machine.
  9. Carrier Laying-off: The cut pipes are then neatly laid off onto a carrier for further handling or packaging

Composition of Equipments:

  1. Hopper Dryer
  2. Single Screw Extruder
  3. Extrusion Mould Die
  4. Head Bracket
  5. Vacuum Calibration Device
  6. Water Cooling Tank
  7. Haul-off Unit
  8. Planetary Cutting Machine
  9. Pipe Bracket
  10. Loader
  11. PLC (Programmable Logic Controller)

Outside Casing Extrusion Equipment For Natural Gas Pipeline High Efficiency

Outside Casing Extrusion Equipment For Natural Gas Pipeline High Efficiency
gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery Advantages:
The inclusion of PUF (Polyurethane Foam)

  1. Increased Operational Reliability and Availability:
    • Remote condition monitoring of PUF insulation enables real-time tracking of the insulation's integrity and performance. This ensures that any issues, such as leaks or deterioration, are identified and addressed promptly, minimizing downtime and enhancing overall operational reliability.
  2. Simplified Construction, Maintenance, and Repair:
    • The use of PUF insulation simplifies pipeline construction as it reduces the complexity of the installation process. Maintenance and repair activities are also streamlined, as the insulation material is easily accessible and can be repaired or replaced with minimal disruption to the pipeline's operation.
  3. Extended Service Life:
    • PUF insulation significantly increases the service life of pipelines, offering a lifespan of 30-40 years compared to traditional insulation methods that typically last 5-10 years. This longer lifespan translates into reduced replacement costs and improved asset utilization.
  4. Reduced Heat Losses:
    • By effectively insulating the pipeline, PUF insulation minimizes heat losses to as low as 8%, significantly outperforming traditional insulation methods that often suffer from heat losses of 30-40%. This enhanced thermal efficiency leads to lower energy consumption and reduced operating costs.
Send your message to this supplier
Send Now

Outside Casing Extrusion Equipment For Natural Gas Pipeline High Efficiency

Ask Latest Price
Watch Video
Brand Name :
Huashida
Certification :
ISO9001
Place of Origin :
Qingdao,Shandong,China
MOQ :
1
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time :
2months
Contact Supplier
video
Outside Casing Extrusion Equipment For Natural Gas Pipeline High Efficiency
Outside Casing Extrusion Equipment For Natural Gas Pipeline High Efficiency
Outside Casing Extrusion Equipment For Natural Gas Pipeline High Efficiency

Qingdao Huashida Machinery Co., Ltd.

Verified Supplier
2 Years
shandong, qingdao
Since 2003
Business Type :
Manufacturer
Total Annual :
3000000-5000000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement