Product Overview
The 3PE anti-corrosion coating production line is designed for applying a three-layer coating to steel pipes, enhancing their mechanical strength, electrical insulation, and durability. It is ideal for oil, gas, water, and other fluid transmission pipelines.
Coating Structure:
First Layer: Fusion-bonded epoxy powder (FBE > 100µm)
Second Layer: Adhesive (AD) 170 ~ 250µm
Third Layer: Polyethylene (PE) 2.5 ~ 3.7mm
Key Features:
·Enhances pipe lifespan from 5-10 years to 50-100 years
·High mechanical strength, excellent electrical insulation, waterproof, wear-resistant, and anti-aging properties
·Suitable for harsh environments and corrosive conditions
Production Line Components
Rust Removal Equipment: Includes shot blast cleaning machine, dust collectors, and rust removal PLC control system.
Coating Equipment: Features powder spraying device, heating system, coating devices, cooling spray, and extruders.
Platform Equipment: Steel pipe platform, storage platform, hydraulic equipment.
Groove Equipment: Includes PE beveling machines and lifting machinery.
Compressed Air Equipment: Air compressors, precision filters, and gas tanks.
Main Equipment of 3PE anticorrosion processing
Configuration List
No. | Name | Set |
A. Derusting Equipment | ||
1 | Pipe-converying Equipment | 1 |
2 | Shot Blast Cleaning Machine | 1 |
3 | Cyclone Dust Collector | 1 |
4 | Pulse dust collector | 1 |
5 | Centrifugal exhaust fan | 1 |
6 | Rust removal equipment PLC | 1 |
B. Coating equipment | ||
1 | Coating transfer equipment | 1 |
2 | IF heating device | 1 |
3 | Powder spraying device | 1 |
4 | Automatic loading dryer | 2 |
5 | SJ-65/30 Extruder | 1 |
6 | SJ-180/30 Extruder | 1 |
7 | Hot melt adhesive extruder die | 1 |
8 | PE sheet extruder head mold | 1 |
9 | Hot melt adhesive/PE sheet coating device | 1 |
10 | Environmental Protection Ventilation equipment | 1 |
11 | Cooling Spray equipment | 1 |
C.Platform Equipment | ||
1 | Steel pipe platform | 1 |
2 | Post-rust removal transition platform | 1 |
3 | Product tube storage platform | 1 |
4 | Hydraulic Equipment | 3 |
D.Groove Equipment | ||
1 | PE Beveling Machine | 2 |
2 | Hydraulic Lifting and Turning Machinery | 1 |
3 | Hydraulic Equipment | 1 |
4 | PLC | 1 |
E.Compressed air Equipment | ||
1 | Screw Air Compressor | 1 |
2 | Cold dry machine | 1 |
3 | Precision filters | 3 |
4 | Gas tanks | 1 |
Product Picture
Technological Process
Pipe Input: Upload pipes
Conveying: Pipe screw conveyor
Rust Removal: Intermediate frequency heating
Coating: Epoxy powder coating, adhesive, and polyethylene
Cooling: Spray cooling system
Finishing: Grinding and unloading pipes
Specifications
Pipe Diameter Range: Φ159 ~ Φ1220
Coating Thickness: 80 ~ 800µm
Production Output:
Max. 3-8 km/day
Annual processing capacity: 2 million square meters (Φ508mm)
Coating Standards: Meets SY/T0413-2002, GB/T23257-2009, German DIN 30670, American Corrosion Association, and other international standards.
Frequently Asked Questions
What is the pipe diameter range the equipment can produce?
-48-219mm, 219-1220mm, 800-1600mm, 1000-2400mm
What is the sandblasting grade?
-SA2.5
What is the anti-corrosion coating standard?
-Meets multiple international standards, including SY/T0413-2002 and DIN 30670.
What is the delivery time?
-2-3 months after deposit.
What is the production output?
-Max. 3-8 km/day, annual capacity of 2 million square meters (Φ508mm).
What is the coating thickness?
-80 ~ 800µm.
Where has the 3PE equipment been sold?
-Countries including Russia, Iran, UAE, India, Belarus, Kazakhstan, etc.
What after-sales services are offered?
-Warranty: 12 months for mechanical parts, 6 months for electrical parts.
Support: Technical services, training, and guidance for operators.
Packaging &Shipping
Packaged by wrapping film, the charge should be beard if used wooden pallet or wooden case demanded by buyer.
After Sales Service
-The guarantee period is 12 months for machinable parts, 6monthes for electrical parts. After the end of the Guarantee period the Supplier is obliged to provide with lifelong service at the expense of Buyer.
-During a warranty period of exploitation the Seller undertakes to execute warranty service of the equipment, troubleshooting and replacement of out of service spares, except for breakings, bound with incorrect exploitation of the equipment by the Buyer.
-Seller provide the technical service with free, and training the workers of buyers.
Company Profile
Exhibition
Certification