100T Miniature Injection Plastic Machine
|
|
| GS98V | ||
A | B | C | |||
| Screw Diameter | mm | 32 | 36 | 40 |
Screw L/D Ratio | L/D | 22.5 | 20 | 18 | |
Shot size(Theoretical) | cm3 | 121 | 153 | 188 | |
PS) Injection Weight | g | 110 | 139 | 171 | |
PS Injection Rate | g/s | 66 | 84 | 104 | |
PS Plasticizing capacity | g/s | 9.9 | 11.3 | 13.9 | |
Injection Pressure | Mpa | 237 | 188 | 152 | |
Screw Speed | Rpm | 0-205 | |||
| Clamp Tonnage | KN | 900 | ||
Toggle stroke | mm | 320 | |||
Space Between Tie Bars | mm | 360*360 | |||
Max.Mold Height | mm | 380 | |||
Min.Mold height | mm | 150 | |||
Ejector stroke | mm | 100 | |||
Ejector tonnage | KN | 33 | |||
Ejector Number | piece | 5 | |||
| Max.Pump Pressure | Mpa | 17.5 | ||
pump motor power | KW | 7.5 | |||
Heater Power | KW | 6.2 | |||
Machine Dimension(L*W*H) | m | 4.32*1.2*1.86 | |||
Machine Weight | t | 3.46 | |||
PS Hopper Capacity | Kg | 25 | |||
Oil Tank Capacity | L | 240 |
Main Features:
● After preform injection, the heat is used for bottle blowing, no need of preform packaging, storage, reh- eating and other working procedures.
● Less land occupation, simple management, high degree of automation, less labor intensify (1 person can control more than 3 machines).
● With a temperature adjustable station, suitable for complicated shape, difficult forming products (such as PP IV-solution bottles).
● The compact structure greatly shortens the production cycle and enhances productivity.
● Adopt variable pump and servo motor, maximally reduce energy consumption.
● The replacement of the mold cost is far lower than similar foreign equipment.
FAQ:
Q1: Are you a trading company or a manufactory?
A1: We are a manufactory, we supply the factory price with good quality, welcome to visit !
Q2: What’s your guarantee or the warranty of the quality if we buy your machines?
A2: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q3: When can I get my machine after I paid?
A3: The delivet time is based on the exact machine you confirmed.
Q4: How can I install my machine when it arrives?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.
Q5: How about the spare parts?
A5: After we deal down all the things , we will offer you a spare parts list for your reference.