Plastic Cup Making Injection Moulding Machine Price
| GS128V | ||||
A | B | C | |||
| Screw Diameter | mm | 36 | 40 | 45 |
Screw L/D Ratio | L/D | 23.3 | 21 | 18.7 | |
Shot size(Theoretical) | cm3 | 173 | 214 | 270 | |
PS) Injection Weight | g | 157 | 195 | 246 | |
PS Injection Rate | g/s | 83 | 102 | 130 | |
PS Plasticizing capacity | g/s | 11.3 | 13.9 | 18 | |
Injection Pressure | Mpa | 231 | 188 | 148 | |
Screw Speed | Rpm | 0-180 | |||
| Clamp Tonnage | KN | 1280 | ||
Toggle stroke | mm | 360 | |||
Space Between Tie Bars | mm | 410*410 | |||
Max.Mold Height | mm | 450 | |||
Min.Mold height | mm | 150 | |||
Ejector stroke | mm | 120 | |||
Ejector tonnage | KN | 33 | |||
Ejector Number | piece | 5 | |||
| Max.Pump Pressure | Mpa | 17.5 | ||
pump motor power | KW | 11 | |||
Heater Power | KW | 9.75 | |||
Machine Dimension(L*W*H) | m | 4.85*1.27*1.96 | |||
Machine Weight | t | 4.6 | |||
PS Hopper Capacity | Kg | 25 | |||
Oil Tank Capacity | L | 280 |
Advantage: Strong Technical design ability, Stable quality, and large production capability, Famous brand.
GS servo energy saving Injection Molding Machine, equipped with high performance servo motor controlling system, the machine's output power can vary in accordance with the loading changes,which reduce
energy consumption and noise. The motor rotates at lower speed in holding pressure stage, an doesn't
work in cooling time.
The Performance of servo energy-saving molding machine:
- Servo motor can optimize the match of energy demand and realize automatic adjustments.
- It can improve injection precision
- It can greatly save power and water, resulting in environment-protection and energy-saving
- Quick response and low noise.
FAQ:
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.