Custom Precision Plastic Spare Auto Part Connector Injection Mold
Mould Information:Product Description | |
Name | Plastic injection moulding |
Color | White, black or as per customer's requirement |
Material | ABS, PC, PP, PS, POM, PMMA, PE, AS, PPSN, |
Mould Base Material | LKM, FUTABA, HASCO, etc. |
Process | CNC, deep drilling, bending, punching, threading, |
Surface treatment | Powder coating, polishing, chrome plating |
Quality Control | Conducted by ISO9001 |
Equipments | NC, EDM, Argie Charmilles, Milling Machine, 3D CMM, |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Inspection | IQC, IPQC,FQC,QA |
Application | All kinds of cars, machinery, home appliance, |
How To Custom My Own Plastic Household Injection Mould?
STEP | DETAIL |
1.Enquire /Quote | Discuss with customers after received buyer’s samples or drawings. |
2.Negotiation | Quality,Technique requests,Mould material,Price,Delivery time,Payment,etc. |
3.Place order | Sales contract + proforma invoice. |
4.prepaid | Customer T/T deposit to us to start to design mould. |
5.Mould design | We will communicate&exchange the opinion with customers during making drawing according to the sample. |
6.Design confirmation | Send mould drawing to customer for confirmation. |
7.Mould processing | Start to manufacture, we will sent photos to show tooling process. |
8.Sample confirm | Send the sample or as negotiation. |
9.Mass production | Mass production plastic products can be avialable. |
Q1 How to have my components quoted?
A1: Please contact us via trade manager or Email and send us your drawings inclusive of 2D and 3D(.STEP or .IGES files) and detail requirements. We are pleased to sign NDA with you if you prefer.
Then our engineering team will work on them and submit a competitive quotation to you.
Q2 What is the lead time for tooling and sample fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 20-45days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15days normally.
Q3 Can I have prototypes for testing before tooling?
A3: Yes, our factory has a team to support prototypes with the machining process to fabricate them for your testing.
Q4 How to ship the samples and production order?
A4: We will normally ship samples via DHL, UPS, or FedEx via our cooperated forwarder of freight collect. For the shipping of production order, it will be by sea or by air.
Q5 How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect production and finished products, then submit a quality Inspection report together with samples.