Details Of CRJQ-63
xternal diameter(mm) | Melting depth(mm) | Heating time(s) | Processing time(s) | Cooling time(min) | |
A | B | ||||
20 | 14.0 | 14.0 | 5 | 4 | 3 |
25 | 15.0 | 16.0 | 7 | 4 | 3 |
32 | 16.5 | 18.0 | 8 | 4 | 4 |
40 | 18.0 | 20.0 | 12 | 6 | 4 |
50 | 20.0 | 23.0 | 18 | 6 | 5 |
63 | 24.0 | 27.0 | 24 | 6 | 6 |
Instruction for use
1.Coating die
Place the welding machine on the support, select the die according to the diameter of the pipe, and then fix it
on the machine. Usually, the little endian is at the front and the big endian is at the back.
2. Power on
Turn on the power (make sure the power supply has a leakage protector), the green and red lights are on, wait
until the red light goes out and keep the green light on, indicating that the machine has entered the automatic
temperature control mode and the machine can be used.
Note: In the automatic temperature control mode, the red and green lights will alternate on and off, which indicates
that the machine is in a controlled state and will not affect operation.
3.Fusion tube
Cut the tube vertically with a cutter, push the tube and fittings into the die, do not rotate. Remove them as soon as
the heating time is reached (see table Above) and insert
Packing