Cleaners, care products or other liquids often either need to be distributed evenly or foamed. SHARE foam generating tube can achieve both. Our foam tubes are designed with 2 mesh surfaces. There are two mesh screens on either side of the cylinder so it'll introduce air into the soap and that's where you get the foaming soap from. The dual-mesh design allows air to mix with the soap, creating a more foamy lather than single mesh as it is dispensed.
Injection-molded customer product:
SPECIFICATIONS
![]() | Dual Mesh Foaming Maker Tubes
|
![]() |
|
DIMENSION IMAGE
PRODUCT GALLERY
PACKAGING & SHIPPING
For mesh rolls:
1. Rolled on the paper core, 30-70m/roll, packed into PE bags, the product label is attached on the edge of each roll
2. 2-8 rolls per standard export carton
3. Put into PP woven bag to prevent damage during transportation
4. Package belt strengthen
For fabricated filters:
1. Packed into sealed PE bags, 10pcs to 500pcs/bag according to the actual size, double bagged and the product label is attached in the inner bag
2. Put into bigger PE bag and then standard export carton
3. Wrapped the outer carton with PE stretch film to prevent damage during transportation
4. Package belt strengthen if pallets are available
The label contains the following standard information:
item name, manufacturer, material, dimensions, manufacturing date, order number, batch number etc.
Port to Port | Door to Door | |
Express(DHL,UPS,FEDEX, EMS) | 1 - 5 days | |
Air Freight | 1 - 5 days | 4 - 10 days |
Sea Freight(FCL) | 15 - 30 days | 20 - 35 days |
Sea Freight(LCL) | 15 - 30 days | 22 - 37 days |
1. Where is your factory located? How can I visit there?
We are in Taizhou city, Zhejiang province China. By train, we are one hour away from Hangzhou and two hours away from Shanghai.
2. Can I get free samples and how long can you deliver them?
We are pleased to provide you with free samples for your evaluation, which will be sent to you within 2 days. Please feel free to reach out to us for samples.
3. How long does a quotation take?
In most cases, we respond within 2 days. If something in RFQ need be confirmed, we will promptly notify you soon.
4. How quickly can I get my order finished?
The production lead time is dependent on the quantity. Typically, it takes 5 to 15 working days for us to complete mass production once you have placed the order.
5. What about your quality control?
By visual inspection, optical or pressure sensitive equipment and automated 3D image-inspection equipment, our production operators conduct self-inspections at every stage of the process. Additionally, we have spot inspections and final inspections carried out by our Quality Control (QC) team.
6. What's your largest advantage?
One of our core competencies is our excellent converting capabilities from yarn over weaving to converted items with professional technical team and quality guarantee and management for more than 30 years.
7. What kind of payment terms do you accept?
T/T and LC and more.