Nylon material is resistant against PH 3 to 14, it has good resistance against alkalis, organics and corrosives. Nylon is anti-aging, wear-resistant, pressure-resistant, durable and high-temperature resistant, SHARE nylon mesh filter are widely used in laboratory, industrial, pharmaceutical applications, such as for paint filters, automotive filters, air purifier filters, air conditioner filters , circulating & waster water filter , cell strainer, blood filter transfusion , wound care, injector filtration, coffee filter, biopsy bag, milling mesh, test/sample sieve, filters for agricultural instruments, filtration of powder and liquid chemicals, etc.
Due to its excllent chemical stablity, SHARE nylon mesh filter discs is very suitable for rinsing liquids like aqueous cleaner, ethanol, spirit, aliphatic hydrocarbons, ace tone, isopropanol etc.
Specifications
Item Name | Chemical Resistant Laser Cut Polyamide Nylon Mesh Filters |
Manufacturer | Taizhou Share Filters Co., Ltd. |
Material | Nylon |
Color | White |
Pore Size | 10, 20, 30, 40, 50, 60, 70, 100, 200, 300 um |
Shape | Circular or square sheet |
Dimensions | 25, 47, 55, 90 mm or custom size |
Application | Ideal for straining, filtering and screening solutions or suspensions used in laboratory, industrial, food, medical and pharmaceutical applications. |
Features
SHARE Fabrication Capabilities
![]() SHARE Fabricated Product | SHARE Fabrication Capabilities | |||
COLD | HEAT | ULTRASONICS | LASER | |
Continuous & tubular ribbons | Ribbon | Ribbon | Ribbon | |
Double seam tubular ribbon | Double seam tubular ribbon | |||
Multiple layer ribbon | Multiple Layer ribbon | |||
Multiple layer tubular ribbon | ||||
Single seam tubular ribbon | ||||
Tubes & Rectangles | Filter segment, two sides heat cut, two sides cold cut | Rectangle, four sides ultrasonically cut | ||
Rectangle, two sides heat cut and two sides ultrasonically cut | ||||
Tube, two open ends | Tube, two open ends, hot wire cut | |||
Tube, one end sealed | Tube, two open ends, laser cut | |||
Tube special execution (single/double layer) | ||||
Biopsy bag with or without flaps | ||||
Shapes | Cold punched part (single layer) | Punched part (single or multiple layer) | Single layer shapes, laser cut | |
Pleated Element | Pleated pack (ultrasonically cross cut) | |||
Pleated cartridges (ultrasonically sealed) | ||||
Cone Shaped (Truncated) | Single seam | |||
Double seam (single/double layer) |
Your Benefits
Packaging & Shipping
For mesh rolls:
1. Rolled on the paper core, 30-70m/roll, packed into PE bags, the product label is attached on the edge of each roll
2. 2-8 rolls per standard export carton
3. Put into PP woven bag to prevent damage during transportation
4. Package belt strengthen
For fabricated & molded filters:
1. Packed into sealed PE bags, 10pcs to 500pcs/bag according to the actual size, double bagged and the product label is attached in the inner bag
2. Put into bigger PE bag and then standard export carton
3. Wrapped the outer carton with PE stretch film to prevent damage during transportation
4. Package belt strengthen if pallets are available
The label contains the following standard information:
item name, manufacturer, material, dimensions, manufacturing date, order number, batch number etc.
Port to Port | Door to Door | |
Express(DHL,UPS,FEDEX, EMS) | 1 - 5 days | |
Air Freight | 1 - 5 days | 4 - 10 days |
Sea Freight(FCL) | 15 - 30 days | 20 - 35 days |
Sea Freight(LCL) | 15 - 30 days | 22 - 37 days |
FAQ
1. Where is your factory located? How can I visit there?
We are in Taizhou city, Zhejiang province China. By train, we are one hour away from Hangzhou and two hours away from Shanghai.
2. Can I get free samples and how long can you deliver them?
We are pleased to provide you with free samples for your evaluation, which will be sent to you within 2 days. Please feel free to reach out to us for samples.
3. How long does a quotation take?
In most cases, we respond within 2 days. If something in RFQ need be confirmed, we will promptly notify you soon.
4. How quickly can I get my order finished?
The production lead time is dependent on the quantity. Typically, it takes 5 to 15 working days for us to complete mass production once you have placed the order.
5. What about your quality control?
By visual inspection, optical or pressure sensitive equipment and automated 3D image-inspection equipment, our production operators conduct self-inspections at every stage of the process. Additionally, we have spot inspections and final inspections carried out by our Quality Control (QC) team.
6. What's your largest advantage?
One of our core competencies is our excellent converting capabilities from yarn over weaving to converted items with professional technical team and quality guarantee and management for more than 30 years.
7. What kind of payment terms do you accept?
T/T and LC and more.