Customizable Color Coated Aluminum Coil 3003 H24 Colour Aluminum Roll Prepainted Aluminum Coil
Scope of application:
The gap is required to be tight; Multi layer insulation must be caulked, and the caulking distance shall not be less than 300mm. The axial butt joints of the inner and outer layers of insulation products shall be staggered by 25 °. The thermal insulation materials shall be bound firmly, close to the equipment or pipeline wall, and the surface of the thermal insulation layer shall be flat and beautiful.
When the pipe insulation aluminum coil is constructed by binding method, each arc tile shall be bound with at least two galvanized lead wires or bands, and the spacing shall not be greater than 500mm.
The longitudinal joint position of the pipeline shall not be arranged within 55 ° of the vertical centerline of the pipeline.
The joint width of thermal insulation products is generally not more than 6mm. And pay attention to staggered joints during construction. When the insulation layer is sealed with adhesive tape, it can be well sewn.
Overview:
Name | Aluminium Coil |
Plate | 25mm-200mm |
Normal sheet | 2.0mm-6.0mm |
Grade | 2000 Series, 6063 6061 5005 5052 7075 |
Tolerance | ±3% |
Normal sheet | 2.0mm-6.0mm |
Alloy Or Not | Is Alloy |
Super thick plate | more than 200mm |
FAQ:
Q1 . Can I have a sample order for stainless steel strips products ?
A : Yes , we welcome sample order to test and check quality . Mixed samples are acceptable .
Q2 . What about the lead time ?
A : Sample needs 3-5 days
Q3 . Do you have any MOQ limit for stainless steel strips products order ?
A : Low MOQ , 1pcs for sample checking is available
Q4 . How do you ship the goods and how long does it take to arrive ?
A : We usually ship by DHL , UPS , Fedex or TNT . It usually takes 3-5 days to arrive . Airline and seashipping also optional For mass products , ship freight is prefered
Q5 . Is it OK to print my logo on products ?
A : Yes , OEM and ODM are available for us
Q6 : How to ensure the quality ?
A Mill Test Certificate is supplied with shipment . If needed , a Third Party Inspection is acceptable