Manufacturer ATE High-Speed Power Supply Testing System for Adapters and Switching Power Supplies Automatic Testing Systems.
Universal
• Supports testing of various power supplies (adapters/chargers, LED power supplies, computer power supplies, inverter power supplies, communication power supplies, etc.)!
• Complies with ENERGY STAR and IEC 62301 measurement requirements
• Supports Manufacturing Information System (ShopFloor) interface
• Supports testing of various power supply parameters under CV mode
• Optimized display mode, arbitrary combination of hardware configurations.
High-Speed
• Supports simultaneous testing of multiple single-output power supplies, significantly improving production line capacity (Adapter/charger/LED power supply testing speed is more than double that of the original 6700 system)
• Parallel barcode scanning during testing greatly improves testing speed
Open
• Open hardware platform, allowing for the addition or removal of various testing devices according to customer needs (devices with interfaces such as GPIB, RS-232, USB, etc.)
• Open software platform, allowing for the expansion of various new test items and functions according to customer testing requirements
The high-speed power supply automatic testing system TopFer 6800N adopts the latest system software TopFast ATE with the following main features:
• Complies with ENERGY STAR and IEC 62301 measurement requirements
• Parallel barcode scanning during testing greatly improves testing speed
• Supports simultaneous testing of multiple single-output power supplies, significantly improving production line capacity
• Upgrades the traditional 6000 system hardware to the 8000 system through software
• Powerful report analysis capabilities
• Comprehensive information management functions
• Directly generates Excel output
• Diverse graphic generation functions
• Supports Manufacturing Information System (ShopFloor) interface"
Test items | Comprehensive Test items |
DC output voltage | Input peak current |
DC output current | Input power |
Peak-Peak noise | Current harmonics against regulations |
RMS noise | Input power factor |
Transient response time | Input voltage ramp |
Transient spike | Input freq. ramp |
Voltage regulation | Tracking |
Current regulation | Short circuit test |
Total regulation test | Short circuit current |
Turn ON time | OV protection |
Rise time | UV protection |
Fall time | OL protection |
Hold-up time | OP protection |
Extra timing test | Extended measure |
Inrush current test | In-test adjustment |
Overshoot voltage | AC cycle drop out |
Power good signal | PLD simulation |
Power fail signal | GPIB read/write |
P/S ON signal | TTL signal control |
Power up sequence | Relay control |
Power off sequence | Bar code scan |
Effciency | Dynamic test |
Input RMS current | DC Current under C.V.Mode |