Injection Molding Mold Making With VANASDIS23 Material Coating TiN
Features:
A .Surface: according to drawing
B .Material: VANADIS 23/DC11 as indicated, Any other material and dimension depends on customers' demand.
C .Used Industries: Plastic Automotive Connector Moulds
D .Processing:Milling , Surface Grinding, EDM, Wire EDM, Coating
E .Inspection: Projector/3D/Height Gauge/Micrometer...
F . Tolerance: +/-0.01mm
Part Name | Injection Molding Mold Making With VANADIS23 Material Coating TiN |
Process Flow | Material-Milling -Surface Grinding-EDM-Wire EDM-Coating-Inspection |
Mold Material | DC11/ELMAX/CALMAX/SKD11etc or as your request |
Finish | TiN coatin, DLC coating etc |
Tolerance | According to drawing indication |
Machining equipment | Grinding machine,EDM machine, WEDM machine,CNC, Coating Machine |
File Format | UG,Pro/Engineer,Auto CAD |
Service | Warm and quick response service provided by the professional Export Sales Team with many years' experience in handling exports to the US, Europe, Japan and other countries and regions. |
Production Equipent
Grinding Machine | 11 units |
Sodick AG40L CNC EDM | 2 units |
Mitsubishi EDM | 2 units |
Milling Machine | 1 units |
Fanuc CNC Machining | 2 units |
Drling machine | 1 units |
Engraving machine | 1 units |
Inspection Equipment
We have built quality checks in each and every step of the manufacturing process. Stringent process control are employed right from incoming material, up to final inspection of the finished goods. we are equipped with a full set of quality control equipment. Coupled with highly skilled manpower for judgement and expertise, we try to eliminate non-conformance product in achieving zero defects.
Our Advantage
A: The Japanese materials in our company are purchased from Japan’s first level agent in China. Swedish materials are purchased from China ASSAS and Germany materials are purchased from Shanghai Xinchang with material certificate provided by the first level agent in shipment. Our company believes in the management philosophy of“integrity first
B: The delivery cycle is generally 5~15 working days mainly according to the quantity and the degree of drawing. If it is particularly urgent for you, we arrange urgent order and try to solve problems .for you during the shortest lead time. We would usually use DHL for international in delivery. The clients can usually get the goods at the third day after shipment. If there occurs damage or missing, we will be responsible. In fact, DHL’s service is the best and we basically do not need to worry about it.
C: Please rest assured that all our products are QC inspected and accepted with inspection report before delivery and generally there will no non-conformance; in case of non-conformance, we will have them reworked or repaired at the first time