Product Description Of Core Insert:
Core Insert shares some similarities with overmolding. both incorporate disparate materials into the same part, thus improving its properties. both processes drive up the cost of molded parts slightly, but this price delta is typically offset by the elimination of manual post-molding operations. and the lead time for overmolded and core insert molded parts is 15 days, a bit longer than protolabs’ single-part injection molding turnaround, but still much faster than traditional core insert
But where overmolding is a two step process, requiring one shot for the substrate and another for the overmold, core insert molding is, as an industry saying goes, “done in one.” the threaded core insert, bushing, sleeve, or boss is manually placed into the mold, the mold closes, plastic flows, the mold opens, and the part is ejected. the result is improved part strength and reliability
In addition, another benefit of using insert molding, in many cases, is a reduction in product weight. weight would be trimmed when a plastic part, with metal inserts, replaces an all metal part. and as mentioned previously, overall part costs are frequently lower with insert molded parts than those that journey on to the assembly area
Specification:
Hardness:
Material Inner hardness Surface Hardness Heat Treatment
H13 HRC43°±2° HV1000°±100° Nitrided
HRC52°±2° HRC52°±2° Vacuumed
Usage:
Mold core insert mainly used in Daily Packaging, Medical, Cosmetics etc
The high surface finishing and coating can reduce friction and increase pin service life, tolerance can be reached within 0.002mm
Delivery:
Delivery time is usually 6 days for type of Core Insert Parts, specific time is according to quantity and drawing
Shipping:
We ship using express such as DHL, UPS, FEDEX etc. or according to customer's requirement, it takes about 3 days to arrive your front door, and proof of shippments are provided with a shipping or tracking number
And it will be shipped by occean shippment for larger quantity items, which is more economic for customers
Payments:
TT and Western union payment or according to negotiation of both parties.
FAQ:
Q1: What Do You Need To Provide A Quote?
A: Please kindly send us the drawing or sample of your product, Details below should be included
1.Materials 2. Surface Finish 3. Tolerance 4. Quantity 5.other special requirements
Q2: How Long Is Your Delivery Time?
A: Generally within 2 days of inventory. it is 7-30 days produce an order from MOQ to 40HQ container. but the exact delivery time might be depend on different quantity
Q3: Do You Provide Samples ? Is It Free Or Extra ?
A: Yes, we are honored to offer you samples or raw material for quality inspection, but do not pay the cost of freight
Q4: How Does Your Factory Do Regarding Quality Control?
A: Quality is priority, Senlan always attach great importance to quality control from the very beginning to the end of the production, before processing we need to test the material first, during the processing we use bar code to tracking the proceeding, every product will be fully polished and we will do 100% quality inspection before shipment
Q5: What's Your Warranty Terms?
A: We provide free replacement of our parts in case of any unnormal broken within 6 months, the lifespan of parts mainly depends on its material and consumption rate, also correct using method