Brass Machining Parts Customized processing of H62 brass brass
Brass is widely used in the manufacture of plate, Bar, Bar, pipe, profile, also used for casting machine parts. Common brass containing 62% and 68% copper has a high plasticity and can be used in the manufacture of compression equipment
Material | *Aluminumcustom cnc turning parts |
*Stainless Steel, Steel | |
*Brass | |
*Copper | |
*Plastic | |
Surface treatment | Sandblasting, Anodizing Color, ZincNickel Plating, Powder coating, Polishing And Brushing, Etc |
MOQ | Quantity is not limited, small order can be accepted cnc machining parts |
Drawing Format | STEP, CAD, DXF, PDF, IGS, etc Or Samples |
Delivery Time | 5-25 Days, Depends on the quantities cnc turning parts |
Tolerance | +/- 0.01mm |
QC | 100% inspection before shipment |
OEM&ODM | We can design for you or production products same as your drawing |
Our service | Free sample and free design service can be provided |
FAQ
1. What do you do?
We are a professional component manufacturer with over 15 years export experience. Focus on cost saving, functional approach, and Production Feasibility for your project .
2. How can I get some samples?
If you need, we are glad to offer you samples for free, but the new clients are expected to pay the courier cost, and the charge will be deducted from the payment for formal order.
3. Can you make CNC machining parts according to our drawing?
Yes, we can make machining parts according to your drawing, 2D drawing, or
3D cad model. If the 3D cad model can be supplied, the development of production can be more efficient. But without 3D, based on 2D drawing we can still make the samples properly
approved.
4. Can you make CNC machining parts based on our samples?
Yes, we can make measurement based on your samples to make drawings for machining parts making.
5. Is it possible to know how are my products going on without visiting your company?
We will offer a detailed production schedule and send weekly reports with pictures or videos which show the machining progress.
6. How about the lead time?
Generally, 3-5 work days, 3-4 weeks for mass production.
7. How do you control the quality?
(1)Material inspection--Check the material surface and roughly dimension.
(2)Production first inspection--To ensure the critical dimension in mass production.
(3)Sampling inspection--Check the quality before sending to the warehouse.
(4)Pre-shipment inspection--100% insp