Custom Made Injection Mould Plastic Parts PC Mould For Household Battery Cover
Part Name | Battery Cover |
Part Number | NTT-263-54-2 |
Drawing Number | 69-1540-2 |
Material | PC |
No. of Cavities | 2 |
Mold standard | 1.2344 |
Injection System | Cold runner |
Shrinkage | 1.006 |
Mold Size | 270x280x251 mm |
Sample Color | Black |
Mold Rough Idea:
Specifications:
Shaping Mode | Plastic Moulding part & injection parts |
Production Equipment | Elite Plastic Injection Machines ,CNC, Mirror EDM machine, Wire Cutting machine, Carving machine, Lathe Drilling machine, Grinding machine, Milling machine, |
Material steel | P20, 738, 738H, 718, 718H, NAK80, S136, S136H, 2378H, 2311, 2083, 2316, H13, SKD61, 2344, 8407 And other material as requirement |
Part material | ABS, PP,PC, POM ,PVC, PE, PET, PMMA , Acrylic, and other material As requirement |
QC Machine | 3D Measurement, Profile Projector, Hardness Tester and other regular size inspection equipment. |
Mold Cavity | Single or Multi-Cavities Available |
Runner System | Cold or Hot-Runner Available(Hasco, yudo, d-m-e etc.) |
Mould Base | LKM, HASCO, DME etc |
Hardness of steel | Vacuum quenching ,Nitride, HRC41-47, HRC46-50,HRC60 |
Standard mould parts | Dme, hasco, JIS, cumsa etc. |
Mold Lead time | 4 Weeks T1 samples , exact time depends on Mould Complexity |
Mould Life | 0.3 Million Shots- 1Million shots (Different steel different production, min mold life 200, 000 shots) |
Packing | Exporting standard |
Our business scope:
1. Plastic mould design & fabrication
2. Injection moulding
3. Secondary operation
Project management flow:
Business Step | |
1. R&D | We support customer R&D. |
2. Quotation Making | Mould Quotation will be finished in 1 day according to information we get |
3. Negotiation | The quality ,price ,material, delivery time .payment item. ect |
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design |
5. Mould | According to customers' request to build the mould. Before make the mould .We make final design to customer approval first . Mould will be usually finished in 25-60 days |
6. Mould Testing | When moulds are finished,we will trial the moulds to check if it satisfy custmers' needs. And we will send samples for consumers' approvement. |
7. Sample confirm | If the first sample come out is not satisfied.we modify the mould until meet customers's requirements. |
8. Delivery | Delivery goods by sea or by air ,according customers requirement |
Our product range:
1. Automobile mold & parts
2. Electricals mold & parts
3. Communications mold & parts
4. Double color mold & parts
5. Clear parts & mold
6. Precision parts & mold
Our advandage:
1. Professional manufacturer
2. Certificates: ISO 9001:2008
3. Highly skilled manufacturing process
4. A variety of ODM&OEM product range
5. Strict quality Control System
6. Advanced equipment and excellent R&D Team
7. Software for specification drawings: Pro/E, Auto CAD, solid work 2001,CAXA,UG,CAD,CAM