Quality Control:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing or Cold Rolling, On line inspection
5. Heat Treatment
6. Straightening/Cutting to specified length/Finished Measuring Inspection
7. Quality Testing in own lab with Tensile Strength, Yield Strength, Elongation, Hardness, Straightness, etc.
8. Packing and Stocking.
Product Name | GB5310 Seamless Steel Tubes and Pipes for High Pressure Boiler |
Material | 20G 20MnG 12Cr1MoVG |
Delivery Condition | Heat Treatment |
Standard | GB5310 |
Application | Heat Exchanger, Condensers and similar heat transfer apparatus |
Certificate | ISO 9001 |
HS code | 7304319000 |
Delivery Time | 45 days |
Packing | Bundles or Wooden Boxes |
Tags: Boiler Tube, 12Cr1MovG Boiler Steel Tube, High Temperature Tube, Steel Tube, Seamless Boiler Tube