Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4
Referenced Standard:
EN10027-1, Designation system for steels-part1: Steel names
EN10027-2, Designation system for steels-part2: Numerical system
EN10204:2004,Metallic products-Types of inspection documents
EN10266:2003 Steel tubes, fittings and structural hollow sections- symbols and definitions of terms for use in products standard
Chemical composition:
Steel grade | % by mass | ||||||||
Steel name | Steel number | C max | Si max | Mn max | P max | S max | Al min | ||
E215 | 1.0212 | 0.10 | 0.05 | 0.7 | 0.025 | 0.015 | 0.025 | ||
E235 | 1.0308 | 0.17 | 0.35 | 1.2 | 0.025 | 0.015 | 0.015 | ||
E355 | 1.0580 | 0.22 | 0.55 | 1.6 | 0.025 | 0.015 | 0.02 |
Mechanical Properties:
Steel grade | Mechanical properties | ||||||||
Steel name | Steel number | Yield strength ReH min MPa | Tensile strength RM MPa | Elongnation after fracture A min % | |||||
E215 | 1.0212 | 215 | 290-430 | 30 | |||||
E235 | 1.0308 | 235 | 340-480 | 25 | |||||
E355 | 1.0580 | 355 | 490-630 | 22 |
Product Name | Automobile gas spring shock absorber steel pipes |
Standard | EN10305, DIN 2393, ASTM A519, etc |
Material | 1020, 16Mn, etc |
Usage | Automobile, hydraulic ,shock absorber,etc |
Technique | Cold drawn |
OD | 5-420mm |
WT | 0.5-50mm |
Length | Max 12000mm |
Tolarance | ±3% |
Certification | ISO9001 ISO14001 TS16949 |
Section Shape | Round |
Payment | T/T ,L/C,Money Gram, Western Union |
Delivery | FOB,CIF,CFR,CPT,etc |
Package | Packed in hexagonal in boxes |
Product Show:
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A&Q
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of SCM 440 42CrMo Mechanical Tubing for Reinforcement sleeve for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us