Prefabricated Building Stable Structure Warehouse Steel Structure Workshop
Main Materials of Prefabricated Building Stable Structure Warehouse Steel Structure Workshop
Standard: | AISI, ASTM, BS, DIN, GB, JIS. | ||
Place of origin: | Qingdao China | ||
Brand name: | Homeshore | ||
Connection: | high strength bolt | ||
Surface treatment: | galvanized or painted | ||
Door: | sliding door or rolling door. | ||
Windows | PVC window or aluminium window. | ||
Coated steel panel | coated steel panel, sandwich panel&glass insulation pad + steel wire mesh | ||
Application: | warehouse workshop plant | ||
Color: | customer required | ||
Performance: | safety, water-proof, sound insulated hear-preservation ect. | ||
Dimension: | customers' requirements. | ||
Material: | Q235 Q345 &Q345B steel | ||
Purlin: | galvanized C/Z section steel. |
General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering.
For the welding, We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.
Packing Materials&Loading:
Packing materials:
Bottom steel rack
Cable wire
Timber
Packing straps
Wooden box
Carton box, etc.
Loading & unloading:
Use 2-3 forklifts to lift the package up and pushed slowly by the end forklift into the 40'GP/40'HC/40'OT containers. The unloading is the same.