Category | Specification |
Container Selection: | lStandard ISO shipping containers: 20 feet or 40 feet in length. |
| lHigh-quality steel construction with corrugated walls. |
| lWind and watertight condition to ensure structural integrity. |
Structural Modifications: | lReinforcement of corners and side walls for structural stability. |
| lCutouts for doors, windows, ventilation, and utility access as per design requirements. |
| lWelding of additional support beams for load-bearing purposes. |
Insulation: | lInstallation of insulation material to regulate temperature and improve energy efficiency. |
| lOptions include spray foam insulation, rigid foam boards, or mineral wool insulation. |
| lCompliance with local climate conditions and insulation standards. |
Electrical Wiring: | lInstallation of electrical wiring for lighting, outlets, and appliances. |
| lAdherence to electrical codes and safety standards. |
| lPlacement of electrical panels and junction boxes in accessible locations. |
Plumbing: | lInstallation of plumbing systems for sinks, toilets, showers, and other fixtures. |
| lUse of durable piping materials suitable for the intended application. |
| lProper drainage and venting to prevent water damage and odors. |
HVAC Systems: | lProvision for heating, ventilation, and air conditioning (HVAC) systems. |
| lSelection of HVAC units based on container size and intended use. |
| lPlacement of vents and ductwork for optimal airflow and climate control. |
Doors and Windows: | lInstallation of commercial-grade doors and windows for security and functionality. |
| lSealing of openings to maintain weatherproofing and insulation. |
| lConsideration of customer preferences for style and placement. |
Safety Features: | lImplementation of safety features including fire extinguishers, smoke detectors, and emergency exits. |
| lCompliance with building codes and regulations regarding occupancy and egress. |
| lProvision for security measures such as locks, alarms, and surveillance systems. |
Quality Assurance and Testing: | lInspection of all modifications and installations to ensure compliance with specifications. |
| lTesting of electrical, plumbing, and HVAC systems for functionality and safety. |
| lDocumentation of workmanship and materials for quality control purposes. |