Product Description
About Bailey Bridge
Bailey bridge is used when there is a need to cross an obstacle for a certain time period. This is often in case of military operations, during or after natural disasters replacement or renovation of consistent bridges or in unusually areas like the movie industry. The function also differs on differs on different users of the bridge which could be pedestrians, common vehicles (car, bus, truck), heavy military equipment (tank) or the railway.
The main advantage of the Bailey Bridge is its flexibility, which can be used for all kinds of emergency rescue, temporary or long-term use, military use, and tourism.
We can also provide bailey bridge components separately, and we can also help you to solve any subsequent bailey bridge component maintenance.
Specification
321(100) truss press limited table |
No. | internal force | |
| |
| | | | | | | |
321(100) | standard truss moment(kN.m) | | | | | | | | |
321(100) | standard truss shear (kN) | | | | | | | | |
200 truss press limited table |
| | |
| |
| | | | | | | |
| standard truss moment(kN.m) | | | | | | | | |
| standard truss shear (kN) | | | | | | | | |
| high bending truss moment(kN.m) | | | | | | | | |
| high bending truss shear(kN) | | | | | | | | |
| Shear force of super high shear truss(kN) | | | | | | | | |
Packaging & Shipping
We use standard shipping containers, and deliveries within 14 days of less than 10t.
Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.
Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.
Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)
Q4: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge.
Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.
How to get a quotation?
1. Usage: military steel bridge, traffic engineering,dangerous bridge reinforcement or other aspects. etc.
2. Total length: 15m- 60m or others.
3. Quantity of the span: single span or double span.
4. Width: single lane 4.2m, double lane 7.35m.
5. Load: HS15-HS25 or others.
6. Surface treatment: painting or galvanization
7. It is better to provide drawings.