Specifications
Brand Name :
ibeehive
Model Number :
200 TYPE
Certification :
AWS or equivalent
Place of Origin :
Shenyang
MOQ :
1pc
Price :
US $1800-2000/Tons
Payment Terms :
Western Union, L/C, T/T, MoneyGram
Supply Ability :
200 tons per month
Delivery Time :
200 tons per month
Packaging Details :
40' GP or customized
Standard :
AISI, ASTM, BS, DIN, GB, JIS
Grade :
Q345B-Q460C
Brand name :
QHHK
Type :
200 type
Application :
Steel structure bridge
Surface :
painting or HDG
Package :
40’ GP & HQ
MOQ :
1pc
Loading port :
Dalian Port, China
Supply ability :
10000 tons/per year
Description

Bailey bridgecomponents with Assembled Temporary

About bailey bridge.

Bailey bridge is used when there is a need to cross an obstacle for a certain time period.This is often in case of military operations, during or after natural disasters replacement or renovation of consistent bridges or in unusually areas like the movie industry. Thereby the function also differs on differs on different users of the bridge which could be pedestrians, common vehicles(cars,busses,trucks),heavy military equipment (tank) or the railway.

Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Features

1. Speed construction- pre-engineered components

2. Easy - to handle, transport, assemble, install and reuse

3. Cost effective to own and re-use in different length bridges

4. Damaged parts can be easily and quickly replaced from stock

5. Made of steel with hardwoord for decking

6. All steel is precision CNC machined and laser cut components

7. Faithfully replicates the key component of the original Bailey Bridge, including the Panels, Transoms, Stringers,

Chesses, Ribands, Rakers, Bracing Frames, End Posts and Sway Braces.

8. Additional sections can be added to increase the length of the bridge

9. Additional panels can be added to create Double and Triple panel bridges.

10. Includes all fasteners, pins and bearings

11. Simple exploded view instructions

12. Sections can easily be separated for transport

Types

Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Type
Moudle
Lanes
width
Bridge Deck
Steel Grade
Corrosion
SS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461

Compnents of bailey bridge

Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Single Row/Double Row Temporary Modular truss bridge Steel Bailey BridgeSingle Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Quality control

General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering.

For the welding, We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.

Single Row/Double Row Temporary Modular truss bridge Steel Bailey BridgeSingle Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

FAQ

Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.

Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.

Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)

Q4: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years

Q5: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure Normal anti-rust paint

Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish

Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure

Q6: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.

Send your message to this supplier
Send Now

Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Ask Latest Price
Brand Name :
ibeehive
Model Number :
200 TYPE
Certification :
AWS or equivalent
Place of Origin :
Shenyang
MOQ :
1pc
Price :
US $1800-2000/Tons
Contact Supplier
Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge
Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge
Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge
Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge
Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge
Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge
Single Row/Double Row Temporary Modular truss bridge Steel Bailey Bridge

Shenyang iBeehive Technology Co., LTD.

Verified Supplier
9 Years
liaoning, shenyang
Since 2000
Business Type :
Manufacturer, Distributor/Wholesaler, Agent, Importer, Exporter, Trading Company, Seller
Total Annual :
50000000-80000000
Employee Number :
400~500
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement