Cost-effectiveness
Steel construction has a more affordable price than wooden construction.
The construction of the steel structure warehouse is rapid, and the emergency advantages are apparent, which can meet the sudden storage needs of the enterprise.
The steel structure warehouse is dry construction, which has outstanding environmental protection advantages. It can reduce the impact of project construction on the environment and nearby residents, which is better than the wet construction of reinforced concrete buildings.
Clearspan
The fewer structural obstacles the building requires, the more work area you can save for the company. Steel construction provides the largest architectural clear span on the market.
The span of the warehouse can step over 60 meters. There is no need to install any load-bearing poles or columns inside the building. It makes it easy to set up large-scale industrial-scale equipment and machines, as well as vehicles and personnel to move safely within the structure.
Environmental friendly
Eco-friendliness is not just a trend. Data shows that building owners and customers who buy products and services are increasingly demanding green buildings. The steel structure is a sustainable building product because it uses recycled materials in the production stage and is 100% recyclable at the end of its service life.
Main Steel Grade: | Q355 Q345 Q235 Q355B Q345B Q235B |
Beam & Column: | Welded or Hot rolled H-section |
Purlin: | Hot Dipped Galvanized C Z Purlin |
Bolt Accessories: | Foundation bolt & High -Strength Bolts & General Bolt |
Wall & Roof: | EPS /Glass Wool/Rock Wool /PU Sandwich Panel Or Corrugated Steel Sheet |
Door: | Sliding Sandwich Panel Door / Rolling Metal Door |
Window | Aluminum Alloy Window / PVC Window |
Surface | Hot-dip galvanized or painted |
Other | Semi-transparent Skylight belts,Ventilators,Downpipe and Gutter ,Crane 5MT, 10MT, 15MT |
Drawings & Quotation: | 1) Customized design is welcomed. |
iBeehive is a professional manufacturer of steel structures, and bailey bridges with 21 years of experience, finished 3520 projects total of 17600000 sqm. We specialize in providing complete solutions including consulting, design, fabrication, and erection of high-quality pre-engineered steel building and steel structure products.
We have 2 factories with a total area of 150000 m², iBeehive has served the pre-engineered building industry with the highly trained crews, specialized equipment, CWI inspector, and 20 professional design team.
1. Design service:
From structural design to cost-effective
2. Manufacturing:
We have two workshops with a total area of 150,000 square meters and three production lines for the shortest lead time.
For every process of processing and manufacturing, we can provide pictures and videos to let you know your construction process in real-time.
3. Installation Instructions:
We provide one-stop installation guidance, from steel column and purlin installation, welding, to wall panel and roof installation, as well as downpipe and door and window installation.
Instructional materials include pictures, videos, or online call instructions.
4. After-sale service:
We ship with 1-3 buckets of paint. When the steel components are worn out in shipping, you can repair them in time.
We offer the most complete packaging to prevent moisture in transit.
Sheets damaged by force majeure in transit, we can ship new ones for free.
After being put into use, any problem can be solved by contacting us.
Payment Terms
1) Payment: T/T(30% prepaid as deposit, balance 70% before shipment) or L/C at sight
2) Delivery time: 15~40 days, as pre customers' order
3) Shipment Loading: 20"GP, 40"GP, 40"HQ, 40"OT or in bulk
Contact us for more details.