Q345b Compact 200 Modular Steel Bridge Steel Pedestrian Bridge
iBeehive is a professional manufacturer of steel structure, bridge with 22 years experience, finished 3520 projects total 17600000 square meter.We have 2 modern factories with a total area of 21000 m2, iBeehive has served the pre-engineered building industry with the highly trained crews, specialized equipment, CWI inspector, and the team of professional engineers. Our factories are among the largest and most advanced steel structure production facilities in the world.
iBeehive specializing in providing complete solutions including consulting, design, fabrication and erection of high-quality pre-engineered steel building and steel structure products.
The international quality system ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 AWS-D1.1/D1.5 and CWI inspector help us to keep our quality every time.
We provide customers with full steel structures such as factory, warehouse, high-rise building, heavy industry, shopping mall, exhibition centers, infrastructure (railway stations, airports...), a variety of steel structure projects such as Nest-type Beijing Olympic Stadium, Gome Logistics Park, Shenyang DongTa Over-river bridge etc.
Our Purpose is to help customers deliver their projects more quickly, safely and efficiently. We achieve this by providing our value-adding engineering expertise, services and products in the right way to our customers.
General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering. For the welding, We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.
Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.
Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.
Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)
Q4: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years
Q5: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure Normal anti-rust paint
Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish
Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure
Q6: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.