Product Information
Product category | Stainless steel CNC machining |
Material available | Stainless steel, aluminum, copper, alloy steel, PTFE, PEEK, nylon, etc. |
Surface treatment | Anodizing, Sandblasting, Heat treatment, Polishing, Powdering, PVD coating, electroplating, silkscreen etc. |
Tolerance | ± 0.01mm |
Quality control | 100% inspection before shipment |
Experience | 15 years of professional OEM service |
Packaging | Safety packaging, or as per customers' requirement |
Lead time | 3-5 days for sample, and 30 days for mass production generally. It can be adjusted according to customers' request. |
Term of payment | T/T, PayPal, etc. |
File formats | Pro-E, SolidWorks, AutoCAD, PDF, or Others. |
Surface Treatment
Aluminum parts: color anodizing, sandblasting and anodizing, brushing, etc
Steel parts: zinc/nickel/chrome plating, black oxide, nitride, carburized, etc
Stainless Steel Parts: polishing, passivating, aser engraving, etc.
Plastic parts: painting, chrome plating, pad printing, sandblasting, etc.
Our Service
Shanghai Elue offers the full spectrum of services including:
Designing & Processing moulds
Molds & Tooling
Molding - Production
Quality Assurance
Our Main Service Now Include
Precision CNC Machined Parts
CNC Milling Parts
CNC Turning Parts
Aluminum Machined Parts
Brass Machined Parts
Stainless Steel Machined Parts
Plastic Machined Parts
Injection Molded Parts
Are you manufacturer or trade company?
We are 100% manufacturer and have been in this field for more than 15 years.
What is the necessary information for a quote?
Please provide the details of your requirement as clear as possible (material, surface finish, drawing, tolerance, quantity etc.), it is better to contact us by Skype, email or phone call in case of any delays.
What kind of raw material can you use?
Stainless steel, aluminum, copper, brass, alloy steel, PTFE, PEEK, nylon, etc.
What kind of surface finish can you provide?
Powdering, polishing, plating, anodizing, hot-dip galvanizing, PVD coating,etc.
How about the lead-time for an order?
It depends on your order quantity, 7-20 working days after confirmation of the order is required generally.
What is the payment term?
30% deposit in advance, balance before shipment.