PTFE Plastic Paste Extruder Machine
Plastic PTFE Paste Machine Features:
ü Adopt adjustable speed to accommodate pitch ,no need to change gear while operation;
ü High productive efficiency ; production rate is three times higher than present usual machine per hour ,the max production reach to 98m/hour;
ü Low noise ,transmission and pulling system adopt absorbing sound ,reducing shake and inserting equipment;
ü Easy maintenance ,transmission flexible, structure easy install and remove.
ü More friendly to environment: no PTFE powder splashing but powder output automatically
ü Intelligent control : producing gaskets by controlling the power quantity
ü More time saving : the power cut off automatically while the production number set up
ü Longer working life : no heat while working.
ü high quality components used.
Flow Chart
Paster Extrusion tube process:
PTFE Fine Powder raw material →Sifting →Mix with solvent→ Heating→ Performing → Extrusion→ Sintering → Finished Tube.
Matched machine: Machine screening, Mixing machine, Performing machine, Extruder machine, and Furnace heating, Mould.
There are several advantages of using a PTFE plastic paste extruder machine:
Techincal Data:
Paste Extruder | Type & Technical Data |
DX-D01 (suit for 25-60 lodaing cavity)OD:2mm-6mm | PTFE Paste extrusion Hose Main machine : 30KW power 380V 50Hz one key start with hydraulic drive.1.2M high for material load cavity.WorkBlank machine : 3KW with 380V 50Hz Hydraulic drive PTFE blank high with 300-600mm.Furnace : 18KW 380V 50Hz with total high 8.5M 500 degree temperature. |
DX-100(suitable for 60-120 loading cavity)OD:6MM-60MM -2 loading cavity | FE Paste extrusion Hose Main machine : 30KW power 380V 40Hz one key start with hydraulic drive.1.5M high for material load cavity.WorkBlank machine : 3KW with 300V 50Hz Hydraulic drive PTFE blank high with 300-600mm. |
Package: The machine will be loaded in container directly with packing, and fixed with steel rope.
Commissioning: We can dispatch engineers to assist and supervise the installation and commissioning of the machine at the end-customer’s factory. Cost for this purpose shall be borne by the buyer as below: 8.1. Return Air Tickets for international travel; 8.2. Engineers’ accommodation (room and boarding), daily allowance at USD 50/person; 8.3. Local transport from hotel to factory and back to hotel.
Expiry Date: Jan,10 2018
Validity: According to the exchange rate between RMB and USD, this quotation shall be valid for10 days.