Hydaulic EPS Block Moulding Machine With Single Door , 7 min / cycle
Application:
1. The machine adopts PLC programmable controller
and touch human-machine interface control ,
automatic feeding,automatic control feeding progress,
has formed a complete guarantee automatic
cycle of production equipment.
2. The machine uses high quality square tube
and welded steel and other groups,each Template
through heat treatment and after assembly of
small deformation,strength and durability.
3. The machine uses a unique heat penetration
of advanced foreign EPS molding process,
penetrating ability,good adhesion,good product quality,
significant energy saving features.
Technical Data:
Item | |||
4000*1240*630 | |||
Block Size | mm | 4000*1200*600 | |
Steam | Entry | Inch | DN150 |
Consumption | Kg/Cycle | 60 - 85 | |
Pressure | Mpa | 0.6-0.8 |
Compressed Air | Entry | Inch | DN40 |
Consumption | m³/Cycle | 1.8~2.5 | |
Pressure | Mpa | 0.6-0.8 | |
Drainage | Vacuum Drain | Inch | DN 125 |
Down Steam Vent | Inch | DN150 | |
Air Cooling Vent | Inch | DN150 | |
Vacuum Cooling Water | Entry | Inch | DN40 |
Consumption | Kg/Cycle | 0.8 | |
Pressure | Mpa | 0.2-0.4 | |
Capacity @15Kg/m³ | Min/cycle | 4 | |
Connected Load/Power | Kw | 23.75 | |
Overall Dimension(L*W*H) | mm | 5700*4000*3300 | |
Weight | Kg | 9500 |
Terms:
Validity: 60 days
Terms of Payment: 30% advance payment by T/T upon signing of sales contract
70% covered by confirmed irrevocable L/C by sight or
T/T before shipping.
Delivery: 60 days after receipt of advance payment.
Installation and Start-up: TWO technicians will be assigned to coordinate installation,
commissioning and training; cost for flight ticket,
suitable accommodation and additional USD 100/day/each worker fee
will be covered by Buyer,
Warranty: 12 months limited warranty
starting from date of arrival excluding wear parts.
Shipping cost for parts to be replaced during warranty period
have to be borne by the customer.