Stable Full Automatic Waste Newspaper Egg Carton / Egg Box Forming Machinery
Specifications:
Model Type | ER4000-A |
Capacity | 4000 pcs/hour |
Workshop Requirement | 900 m2 |
Electricity Consumption | ~170 kw |
Electricity Installed | 250 kw |
Raw Material | Waste Paper / Waste Carton / Newspaper / White Paper |
Material Consumption | 250~280 kg/h |
Water Consumption | 1.0~1.5 ton/h |
Worker Requirement | 4~5 persons |
Container Requirement for Shipment | 8 x 40 HQ |
Forming Machine (Rotary Type) | Rotary type with 8 plates. Each for 4 pcs / time |
Drying Line | 42x1.6x2.4 m 1-Layer |
Remarks: 1. The Capacity calculated base on 30-packed egg tray(size 300x300mm, weight 65g~70g). 2. Workshop size is for reference only and could be adjusted according to actual size of client’s plant. |
Fuel Consumption (One Item Selectable)
Natural gas | 80~90 m3/h |
LPG | 28~32 m3/h |
Diesel | 68~76 kg/h |
Heavy Oil | 70~80 kg/h |
Steam | 1.4~1.6 ton/h |
Wood | 280~320 kg/h |
Coal | 180~ 210 kg/h |
Descriptions:
- It’s a fully automatic egg tray production line
- Mainly used for the products with simple structure but in big quantity, such as egg trays, egg carton, fruit trays, cup carriers and disposable medical care products.
- This type of production line is constituted by a hydrapulper system, a rotary type forming machine, a single-layer drying line, and corollary equipments.
- Products come out automatically from waster paper or other type of paper. It’s high-efficiency, energy-saving, durable, wieldy and safe.
- SIEMENS electrical control parts, FESTO & SMC pneumatic control parts. Apply International famous brand of control parts to obtain excellent performance and universality maintainability.
Production Information and Our Warranty:
- Status: Brand New
- Product Type: Egg Tray Machine
- Processing Type: Pulp Molding Machine
- Place of origin: Guangdong, China
- Brand: NANYA
- Model Type: ER4000-A
- Voltage: 220V - 450V
- Approval: CE, TUV,SGS, ISO9001
- Warranty: 12 Months
- After-Sale Service: Engineers available to service machinery overseas
Applications:
Egg tray | 20,30,40packed egg tray… quail egg tray |
Egg carton | 6, 10,12,15,18,24 packed egg carton… |
Agricultural products | Fruit tray, seeding cup |
Cup salver | 2, 4 cup salver |
Disposable Medical Care Products | Bedpan, sick pad, female urinal… |
packages | Shoe tree, industrial package… |
|
Competitive Advantages:
- Fully automatic production line
- Overseas technical support available
- Proprietary technology
- TUV Supplier Assessment Certificate
- SGS Supplier Assessment Certificate
- CE Certificate
- Nanya - Chinese famous trademark
- Over 20 years experience in this field, Chinese reliable supplier, supported by the government and universities.
- The standing director of Chinese packaging association
Youtube Video Link for Better Understanding:
https://www.youtube.com/watch?v=JCu3xNpnCsM
Business Terms:
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | 30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 100 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service | - The seller will send spare parts for one year use by free.
- The seller will provide operating manual, drawing, process diagram for all of the equipments.
- The seller will instruct the operation, maintain method for the buyer’s worker after installation.
- The seller will instruct the production technology and prescription for the buyer’s engineer after installation;
|
8 | Quotation Validity | 90 days after the offering date |