Big Capacity Rotary Pulp Egg Tray / Fruit Tray Forming Machine with Multi Layer Dryer
Specifications:
Model type | ER3000-B | ER4000-B | ER5000-B | ER6000-B | |
Capacity | 3000pcs/hour | 4000pcs/hour | 5000pcs/hour | 6000pcs/hour | |
Workshop Requirement | 400m2 | 500m2 | 600m2 | 700m2 | |
Electricity Consumption | ~115kw | ~150kw | ~190kw | ~210kw | |
Material Consumption | 180~210kg/h | 250~280kg/h | 320~350kg/h | 360~400kg/h | |
Water Consumption | 600~800kg/h | 800~1000kg/h | 1000~1200kg/h | 1200~1400kg/h | |
Fuel Consumption (one item selectable) | Natural gas | 55~65m3/h | 70~80m3/h | 85~95m3/h | 100~110m3/h |
LPG | 19~22m3/h | 25~29m3/h | 31~35m3/h | 36~40m3/h | |
Diesel | 45~55kg/h | 62~70kg/h | 78~85kg/h | 90~98kg/h | |
Heavy oil | 46~56m3/h | 63~72kg/h | 79~87kg/h | 92~100kg/h | |
Steam | 1.0~1.2ton/h | 1.3~1.5ton/h | 1.6~1.8ton/h | 1.8~2.0ton/h | |
Wood | 190~220kg/h | 250~290kg/h | 310~350kg/h | 360~400kg/h | |
Coal | 130~150kg/h | 160~190kg/h | 200~220kg/h | 240~270kg/h | |
Worker requirement | 4~5person | 4~5person | 4~5person | 5~6person | |
Container requirement for shipment | 6 x 40HQ | 7 x 40HQ | 8 x 40HQ | 9 x 40HQ | |
Forming machine | Rotary type with 8 plates. Each for 3pcs/time | Rotary type with 8 plates. Each for 4pcs/time | Rotary type with 8 plates. Each for 5pcs/time | Rotary type with 8 plates. Each for 6pcs/time | |
Drying production line | 20mx2.2mx4m | 22mx2.6mx4m | 22mx3.0mx4m | 22mx3.4mx4m | |
Remarks: |
Descriptions:
Products Information and Our Warranty:
Working Theory:
YOUTUBE Links:
4000pcs/h with 6 layers dryer: https://www.youtube.com/watch?v=85eeIP8xCEY&t=3s
6000pcs/h with 6 layers dryer: https://www.youtube.com/watch?v=vG2VqoRdFgE&t=12s
Machine Glance:
Applications:
Egg tray | 20,30,40packed egg tray… quail egg tray |
Egg carton | 6, 10,12,15,18,24 packed egg carton… |
Agricultural products | Fruit tray, seeding cup |
Cup salver | 2, 4 cup salver |
Disposable Medical Care Products | Bedpan, sick pad, female urinal… |
packages | Shoe tree, industrial package… |
![]() |
Business Terms:
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | 30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 45~75 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service |
|
8 | Quotation Validity | 90 days after the offering date |