Automatic Paper Pulp Electronic Packing Tray Thermoforming Machinery
Descriptions:
- After wet pressing process, products will be dry in the mould completely.
- This machine can apply to manufacture high quality pulp molding products, such as high-grade packaging, craft products, decoration and etc.
- The machine makes sure each surface of product is smooth, which increases the value of the products. Besides, this kind of machine supports some special design printing, like company’s logo, which will certainly improves company’s image.
- Products with high density and good strength and they won’t be out of shape.
- Easy package and piled, reduced transportation cost and improve economic benefits.
- Less area of the workshop required.
- Add some additives in the process to get special usability requirement. EG: waterproof, oil-proof, anti-static and etc.
- The procedures of forming, drying and hot-press shaping are completed in one machine automatically.
- By adopting the international famous brand controls, the machine performs reliably.
- The machine has wide range of application and it can produce various specifications and different thickness of production by changing the moulds.
Specifications:
Model | HF-01 | HF-02 | HF-05 | HF-10 |
Capacity | 30kg/h | 60kg/h | 150kg/h | 300kg/h |
Main Machine Model & Quantity | YC011—1set | YC011—2sets | YC011—5sets | YC011—10sets |
Heating Method | Electricity | Electricity | Heat Conduction | Heat Conduction |
Workshop Requirement | 200 m2 | 300 m2 | 600 m2 | 1000 m2 |
Power Installation | 150kw | 250kw | 220kw | 400kw |
Material Consumption | 20~25kg/h | 50~60kg/h | 120~140kg/h | 240~280kg/h |
Water Consumption | 80~100kg/h | 150~200kg/h | 500~800kg/h | 1000~1600kg/h |
Workers Requirement | 3 persons | 4 persons | 6 persons | 8 persons |
Container Requirement for Shipment | 1 x 40’HQ | 2 x 40’HQ | 4 x 40’HQ | 8 x 40’HQ |
Forming Type | Vacuum suction, thermoforming | Vacuum suction, thermoforming | Vacuum suction, thermoforming | Vacuum suction, thermoforming |
Drying Method | Drying in mould | Drying in mould | Drying in mould | Drying in mould |
Competitive Advantages:
- Fully automatic
- Energy saving and labor utilization
- High quality production line machine for pulp molding products
- Overseas technical support available
- Proprietary technology
- TUV Supplier Assessment Certificate
- SGS Supplier Assessment Certificate
- CE Certificate
- Nanya - Chinese famous trademark
- 20 years experience in this field, Chinese reliable supplier, supported by the government and university.
- The standing director of Chinese packaging association
Machine Glance:

YOUTUBE Link:
https://www.youtube.com/watch?v=SskObphnQZo
Applications:
Inner Industrial Package for | Electrical Equipment |
Electric Tools |
Car Parts |
Lamp & Lanterns |
Shoe Tree |
Compressor of Air-condition |
Electronic Products |
Instrument |
Communication Apparatus |

|
Business Terms:
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | 30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 60-120 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service | - The seller will send spare parts for one year use by free.
- The seller will provide operating manual, drawing, process diagram for all of the equipments.
- The seller will instruct the operation, maintain method for the buyer’s worker after installation.
- The seller will instruct the production technology and prescription for the buyer’s engineer after installation;
|
8 | Quotation Validity | 90 days after the offering date |