Fully Automatic Molding Pulp Egg Tray Making Machine, Fruit Tray Production Line
Specifications:
Model Type | ER3000-A | ER4000-A | ER5000-A | ER6000-A |
Capacity | 3000pcs/hour | 4000pcs/hour | 5000pcs/hour | 6000pcs/hour |
Workshop Requirement | 500m2 | 600m2 | 700m2 | 800m2 |
Electricity Consumption | ~120kw | ~160kw | ~200kw | ~220kw |
Material Consumption | 180~210kg/h | 250~280kg/h | 320~350kg/h | 360~400kg/h |
Water Consumption | 600~800kg/h | 800~1000kg/h | 1000~1200kg/h | 1200~1400kg/h |
Worker Requirement | 4~5person | 4~5person | 4~5person | 5~6person |
Container Requirement for Shipment | 6 x 40HQ | 7 x 40HQ | 8 x 40HQ | 9 x 40HQ |
Forming Machine | Rotary type with 8 plates. Each for 3pcs/time | Rotary type with 8 plates. Each for 4pcs/time | Rotary type with 8 plates. Each for 5pcs/time | Rotary type with 8 plates. Each for 6pcs/time |
Drying Production Line | 42mx2.2mx3.6m | 42mx2.6mx3.6m | 42mx3.0mx3.6m | 42mx3.4mx3.6m |
Remarks: |
Fuel Consumption (One Item Selectable)
Type | ER3000-A | ER4000-A | ER5000-A | ER6000-A |
Natural Gas | 60~70m3/h | 80~90m3/h | 100~110m3/h | 110~120m3/h |
LPG | 21~24m3/h | 28~32m3/h | 35~39m3/h | 40~45m3/h |
Diesel | 50~60kg/h | 68~76kg/h | 85~92kg/h | 95~100kg/h |
Heavy Oil | 52~62m3/h | 70~80kg/h | 88~95kg/h | 98~105kg/h |
Steam | 1.1~1.3ton/h | 1.4~1.6ton/h | 1.7~1.9ton/h | 1.9~2.2ton/h |
Wood | 210~240kg/h | 280~320kg/h | 350~390kg/h | 400~450kg/h |
Coal | 140~160kg/h | 180~210kg/h | 220~250kg/h | 260~300kg/h |
Descriptions:
Competitive Advantages:
Business Terms:
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | 30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 45~75 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service |
|
8 | Quotation Validity | 90 days after the offering date |
Production Theory:
Technological Process:
Applications:
Company Profile: