Flat Conveyor Pulp Molding Production Line Dryer / Drying Line
Specifications:
Heating Material | Conveyor Width | Length | Transporting Speed | Working Temperature | Capacity |
Oil / Gas | 1.2~2.4 m | 20~50 m | 0.5~3.5 m/min | 180~230℃ | 2~10 ton/24hours |
Coal / Wood | 1.2~2.4 m | 20~50 m | 0.5~3.5 m/min | 140~160℃ | 2~10 ton/24hours |
Biomass Fuel | 1.2~2.4 m | 20~50 m | 0.5~3.5 m/min | 140~160℃ | 2~10 ton/24hours |
Steam | 1.2~2.4 m | 20~70 m | 0.5~3.5 m/min | 140~160℃ | 2~10 ton/24hours |
Conduction Oil | 1.2~2.4 m | 20~70 m | 0.5~3.5 m/min | 180~230℃ | 2~10 ton/24hours |
Electricity | 1.2~2.4 m | 20~50 m | 0.5~3.5 m/min | 180~230℃ | 2~10 ton/24hours |
Double Source | 1.2~2.4 m | 20~50 m | 0.5~3.5 m/min | 180~230℃ | 2~10 ton/24hours |
Descriptions:
- After gathering over ten-year experience for manufacturing thermal drying machinery and absorbing the foreign advanced technology, we’ve developed the drying production line with a lot of R&D achievements and patents. The drying line, with reasonable structure and good shape, works efficiently but consumes less energy.
- The flat conveyor drying line adopts two collocations, namely, drive chain and conveyor net or drive chain and net plate. First, put the products on the conveyor net; let them pass through the furnace which is full of hot air. Then the moisture of products will be evaporated rapidly. Finally, the dried product will be sent out automatically. So the drying speed of this drying line is very fast and the degree of automation is very high.
Competitive Advantages:
- Fully automatic
- Energy saving and labor utilization
- High quality egg tray dryer
- Overseas technical support available
- Proprietary technology
- TUV Supplier Assessment Certificate
- SGS Supplier Assessment Certificate
- CE Certificate
- Nanya - Chinese famous trademark
- 30 years experience in this field, Chinese reliable supplier, supported by the government and university.
- The standing director of Chinese packaging association
Productions Information & Our Warranty:
- Flat Conveyor Drying Line
- Mainly used for drying the products with simple structure but in big quantity, such as egg trays, fruit trays, cup carriers and disposable medical care products.
- Status: Brand new
- Product Type:Flat Conveyor Dryer
- Processing Type: Pulp Molding Drying Line
- Place of origin: Guangdong China
- Brand: NANYA
- Model Type: Flat Conveyor Drying Line
- Voltage: 220V-440V
- Approval: CE, TUV,SGS, ISO9001
- Warranty: 12 Months
- After-Sale Service: Engineers available to service machinery overseas
Applications:
Egg tray | 20,30,40packed egg tray… quail egg tray |
Egg carton | 6, 10,12,15,18,24 packed egg carton… |
Agricultural products | Fruit tray, seeding cup |
Cup salver | 2, 4 cup salver |
Disposable Medical Care Products | Bedpan, sick pad, female urinal… |
packages | Shoe tree, industrial package… |


|
Business Terms:
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | 30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 45-75 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service | - The seller will send spare parts for one year use by free.
- The seller will provide operating manual, drawing, process diagram for all of the equipments.
- The seller will instruct the operation, maintain method for the buyer’s worker after installation.
- The seller will instruct the production technology and prescription for the buyer’s engineer after installation;
|
8 | Quotation Validity | 90 days after the offering date |