Fully Auto Pulp Molded Industuial Package Production line / Double Side / Rotary Type
Specifications:
Model Type | P1640-2 |
Automation | Fully automatic production line |
Capacity | 160~200kgs/h |
Hydrapulper | 2.5m3 , 25kw |
Forming Machine | Double side rotary |
Plate Size | 1600*800mm |
Drying Line | 20m*3m*3m |
Workshop Size Recommendation | ≥600m2 |
Material Consumption | 150~210kg/h |
Water Consumption | 0.6~0.8t/h |
Electricity Consumption | 100kw (150kw installed) |
Fuel Consumption | Natural gas: 50~60m3/h |
Operators Required | 5~6persons (Shift working) |
1. The capacity of the requirement is based on the product weight 150~200g/pc. 2. For different capacity, customized allocation by clients’ requirement is available. 3. The workshop size is only for reference, the actual size can be slightly adjusted according to the customer’s plant. |
Working Theory:
Descriptions:
Competitive Advantages:
Applications:
Agricultural products | Fruit tray, seeding cup |
Cup salver | 2, 4 cup salver |
Disposable Medical Care Products | Bedpan, sick pad, urinal pan… |
packages | Shoe tree, industrial package… |
![]() |
Business Terms
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | 30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 45-75 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service |
|
8 | Quotation Validity | 90 days after the offering date |
Schematic Diagram