Chicken Farm Recycle Paper Egg Tray / Egg Carton Rotary Molding Machine
Specifications:
Model Type | ER3000-A | ER4000-A | ER5000-A | ER6000-A |
Capacity | 3000pcs/hour | 4000pcs/hour | 5000pcs/hour | 6000pcs/hour |
Workshop Requirement | 500m2 | 600m2 | 700m2 | 800m2 |
Electricity Consumption | ~120kw | ~160kw | ~200kw | ~220kw |
Material Consumption | 180~210kg/h | 250~280kg/h | 320~350kg/h | 360~400kg/h |
Water Consumption | 600~800kg/h | 800~1000kg/h | 1000~1200kg/h | 1200~1400kg/h |
Worker Requirement | 4~5person | 4~5person | 4~5person | 5~6person |
Container Requirement for Shipment | 6 x 40HQ | 7 x 40HQ | 8 x 40HQ | 9 x 40HQ |
Forming Machine | Rotary type with 8 plates. Each for 3pcs/time | Rotary type with 8 plates. Each for 4pcs/time | Rotary type with 8 plates. Each for 5pcs/time | Rotary type with 8 plates. Each for 6pcs/time |
Drying Production Line | 42mx2.2mx3.6m | 42mx2.6mx3.6m | 42mx3.0mx3.6m | 42mx3.4mx3.6m |
Remarks: |
Fuel Consumption (One Item Selectable)
Type | ER3000-A | ER4000-A | ER5000-A | ER6000-A |
Natural Gas | 60~70m3/h | 80~90m3/h | 100~110m3/h | 110~120m3/h |
LPG | 21~24m3/h | 28~32m3/h | 35~39m3/h | 40~45m3/h |
Diesel | 50~60kg/h | 68~76kg/h | 85~92kg/h | 95~100kg/h |
Heavy Oil | 52~62m3/h | 70~80kg/h | 88~95kg/h | 98~105kg/h |
Steam | 1.1~1.3ton/h | 1.4~1.6ton/h | 1.7~1.9ton/h | 1.9~2.2ton/h |
Wood | 210~240kg/h | 280~320kg/h | 350~390kg/h | 400~450kg/h |
Coal | 140~160kg/h | 180~210kg/h | 220~250kg/h | 260~300kg/h |
Descriptions:
Working Theory:
YOUTUBE Links:
3000pcs/h with single layer dryer: https://www.youtube.com/watch?v=CX9NgjBZ0Nk
4000pcs/h with single layer dryer: https://www.youtube.com/watch?v=JCu3xNpnCsM
6000pcs/h with single layer dryer: https://www.youtube.com/watch?v=9XpyL-ggwi4
4000pcs/h with 6 layers dryer: https://www.youtube.com/watch?v=85eeIP8xCEY&t=3s
6000pcs/h with 6 layers dryer: https://www.youtube.com/watch?v=YIeLPQnwO4M
Rotray Forming Machine Photo:
30 Cells Egg Tray Image:
Business Terms:
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | T/T, L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China OR CNF OR CIF terms. |
3 | Delivery Time | 90~120 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Overseas engineering service is available |
6 | Warranty | 12 months after installation |
7 | After service | We will send some spare parts to use by free. And we will provide operating manual, drawing, process diagram for all of the machine. We will instruct the operation, maintain method for the buyer’s worker after installation. |
8 | Quotation Validity | 90 days after the offering date |
Competitive Advantages: