Automatic Control Metal Slitting Machine Durable Carbon Steel / Galvanized Coils
Description
Slitting line machine is not only for the steel service cutting industry, but also for the steel pipe industry. Slitting lines are widely used in metal sheet processing industry. Slitting line can do de-coiling, slitting and recoiling works, make coil steel to any needed width coil steel. It mainly includes coil car, un-coiler, coil guide, slitting machine, scrap winder, tension unit, re-coiler and coil car, hydraulic system, Etc. It mainly used in coil or hot rolling carbon steel, silicon steel and all the other kinds of metal materials with surface spreading. This line can be adjusted to do recoiling or dividing work to meet customer’s demand.
Specifications
A - HYDRAULIC COIL CART
B - HYDRAULIC DECOILER
C - LOOP SYSTEM
D - HEAD-GUIDING&HEAD SHOVEL
E - 2ROLLER FEEDING
F - DEVITATION RECTIFYING
G - SLITTING
H - SIDE WASTE RECOILER
I - LEVELLING UNIT
J - PRE-SEPERATOR&TENSIONING MEASURING MACHINE
K - RECOILER
L - UNLOADING COIL CART
M - HYDRAULIC CONTROLLER
N - ELECTRICAL CONTROLLER
Technical data
Productivity | SLIT COIL(0.5-4.0)X1300MM |
Main power required | ONE OPERATOR WITH TWO ASSISTANT |
Total power required | 250K.W |
Set up Time | 20MIN |
Working hours per day | 8 TO 24 |
Direction | Left to Right while facing operator panel |
Overall machine length required | 26M |
Overall packing Dimension | 3 trucks |
Approximate machine height | 1.8M |
Type of material to be processed | Carbon steel/Galvanized coils |
Max. width of coil | 1300MM |
Min. width of coil | 300MM |
Thickness of coil | 0.5-4.0MM |
Max. weight of coil | 15TONS |
Variable line speed | Max.120mtr./min |
Material loading/Unloading system | Automatic |
Coil inner diameter | 508mm |
Coil outside diameter | 1000mm |
After-sale service
1.The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
2.Stud and Track Roll Forming Machine Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
3.Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
4.The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Application
Steel slitting cutting, metal slitting , metal sheet striping
Advantages
Picture