On Grid Solar PV System
Mono 410W 5KW 240V On Grid Solar PV System With 5kW Kstar Inverter
Benefits of Grid-Tied Solar Power System :
1. Reduce your home electricity costs .
2. Sale extra electricity to your local city grid or utility companyto earn moeny .
3. Long life time ,more than 25years .
System Configuration
Sunerise 5KW Home Solar Power Ongrid System | ||
Model | Technical Details | Quantity |
Solar Panel | Mono 410W Solar Panel | 13 pieces |
On grid Inverter | 5KW AC220V-240V,50/60Hz | 1set |
Monitoring System | Wifi | 1piece |
Mounting Support | Pitched /flat roof,ground | 1set |
Cable | Single core 4mm² DC cable | 150 meters |
Multi core 2*4mm² AC cable | 50 meters | |
Tools Bag | 5 kinds of PV installation tools | 1 bag |
System Connection
Product Exhibition
Solar Panel
>25 years warranty
>Highest conversion efficiency of 17%
>PID Resistant,High salt and ammonia resistance
>Lower temperature codfficient less shading and resistive loss
> 5400 Pa snow load,2400 Pa wind sload
On Grid Inverter
>5 years standard warranty
>Support Working in Parallel
>Max.Efficiency 99.6%
>Integrated DC switch for added safety protection
>With WIFI Monitoring Device
Mounting Structure
>Rooftop(Flat/Pitched), Ground , Car Parking Lot
>Adjustable tile angle from 0 to 65 degree
>Compatible with all solar modules.
Cable:
>PV Cable 4mm2 6mm2
>MC 4 compatible Connector
>AC/DC Combiner Box
>AC/DC Breaker
1. Save more money with net metering
Your solar panels will often generate more electricity than what you are capable of consuming. With net metering, homeowners can put this excess electricity onto the utility grid instead of storing it themselves with batteries.
2. The utility grid is a virtual battery
The electric power grid is in many ways also a battery, without the need for maintenance or replacements, and with much better efficiency rates. In other words, more electricity goes to waste with conventional battery systems.
Roof Solar Panel Mounting:
1.Please advise your roof detailed plan ( length & width)
2.What is your pv panels dimension? (L/W/T) & Watt
3.How many panel are you going to mount?_______Nos.
4.What is your planned panel layout? ________Nos. in a row × ________Nos. in a column
5.How is weather there, such as wind speed and snow load?___m/s anit-wind speed and____KN/m2 snow load
6.On-Grid PV System Load Power (W): _______
7.Application for: _______( Commercial / Home)
8.Output Voltage (V):_______
WHY CHOOSE US ?
1.More than 13 years in design complete solar power system
2.We can send our engineer to your country ,guide the installation
3.Free design drawing,Free training service both installation & operation
4.Quality is our culture.stable quality with good brand ,use USA and JAPAN brand power materials.