Rail Components, Fasteners and Rail Elastic clips with HDG coating
Rail clips processing procedures are as follow: Shearing-- Heating to forging temperature -- Forming-- Hardening—Tempering — Inspection — Packing.
About our factory:
Zhongyue has been manufacturing E elastic clips. Most of our elastic clips are exported. Only some of them are sold domestically. Our E clip shows reliable quality after being used for so many years. There is no complaint from any of our customers.
(1) Material: the material is purchased from famous steel factory such as Shagang Group, Shougang Group.
(2) Research and development: we have our own R&D department. Many types of E clips can be custmized in our factory.
(3) The inspection center controls every process of production. Thus making sure E clip can meet customers' requirements.
(4) There are 20 senior technicians and 200 experienced workers in factory. With rich experience, they make high quality products to satisfy every customer.
General Specifications:
Name | Hardness | Fatigue Test | Surface | Standard refers |
E1809, E1817 elastic clip | 44-48HRC | 3 Million cycles without breaking | Oxide black | DIN17221, BS970, GB/T1222, UIC, ASTM |
Material Specifications:
Material | 60Si2MnA | 60Si2CrA | 55Si2Mn | 38Si7 |
Chemical composition(%) | C:0.56-0.64 | C:0.56-0.64 | C:0.52-0.60 | C:0.35-0.42 |
Mn:0.60-0.90 | Mn:0.40-0.70 | Mn:0.60-0.90 | Mn:0.50-0.80 | |
Si:1.60-2.00 | Si:1.40-1.80 | Si:1.50-2.00 | Si:1.50-1.80 | |
Cr:≤0.35 | Cr:0.70-1.00 | Cr:≤0.35 | P:≤0.03 | |
P:≤0.03 | P:≤0.03 | P:≤0.03 | S:≤0.03 | |
S:≤0.03 | S:≤0.03 | S:≤0.03 |
Photos:
How do we produce rail clips?
ZhongYue produces the rail clips according the scientific procedures of rail clip production strictly and the specific procedures are as follow:
How is the quality control of ZhongYue rail clips?
We own a full set of strict quality control system to produce rail clips, from raw material purchasing till the finished clip application. There’s a professional inspection team to check about each process of the production line and every two hour out of the line.
Inspection machine for finished rail clips.