BAREMUL® SQO-31 Non Sticky W/O Emulsifier For High-Aqueous-Phase Formulations
Product name: BAREMUL SQO-31
INCI: SORBITAN SESQUIOLEATE;LAURETH-3
CAS: 8007-43-0; 9002-92-0
BAREMUL® SQO-31 is a novel mixed-polyether emulsifier specifically engineered for high-efficiency water-in-oil (W/O) systems. It enables the creation of stable, high-aqueous-phase (70–85% water) emulsions with diverse lipid phases, including plant/animal oils, mineral oils, synthetic esters, and silicones.
High Stability: Maintains structural integrity under thermal stress (45°C) and freeze-thaw cycles (-17°C).
Sensory Excellence: Yields glossy, refined textures with non-greasy application and no tackiness or stringiness.
Formulation Flexibility: Compatible with cold or hot processing. Supports oil-phase thickeners (e.g., beeswax, hydrogenated castor oil) and aqueous stabilizers (e.g., magnesium sulfate, magnesium aluminum silicate).
Process Simplicity: Achieves stability without requiring fatty alcohols in the oil phase.
Project | Standard |
Appearance(25℃) | Yellowish transparent oily liquid |
Solubleness | Soluble in oil, insoluble in water |
HLB | 3.0-3.5 |
Sapon Value (mg KOH/g) | 140-160 |
Acid value (mg KOH/g) | <10 |
Water content,% | ≤0.5 |
Mercury (mg/kg) | ≤1 |
lead(mg/kg) | ≤10 |
Cadmium(mg/kg) | ≤5 |
Arsenic(mg/kg) | ≤2 |
Massage creams, sunscreens, hair emulsions, foundation creams, and other W/O-based cosmetics.
Dosage: 4–5% (incorporated into the oil phase).
Procedure:
Gradually add the aqueous phase to the oil phase under high-speed agitation.
For cold processing: Add preservatives to the aqueous phase and fragrances to the oil phase.
For heated processing: Introduce fragrances and preservatives at ~50°C post-cooling.
Ensure consistent homogenization speed/duration for batch-to-batch uniformity.
Barrel
Company Profile
Packaging:
Q1. Are you traders or manufacturers?
We are manufacturers, we have factory in Guangzhou, China, .
Q2. How can you get a sample?
We can supply the sample, but the customers have to pay the sample cost and the courier cost.
Q3. How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment.
Q4. How about your delivery time?
Generally, it will take 10 to 30 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.