Rendering Pre-Breaker Model Is JSPSA-1226-02 Rendering Plant Crusher
Generally use crusher to reduce the size of the material and then delivery by screw conveyor or vane pump before cooking. The motor model and the speed of the crushing shaft can be adjusted according to the production demand, the operation cost is low.The design of quick repair and replacement parts makes the crusher more efficient.
1) low speed axis can handle metals in raw materials.
2) equipped with electronic speed monitoring, the motor can be stopped immediately when large matter enter the crusher.
3) the spindle is equipped with heavy roller bearings, which can resist large radial and axial impact.
Structure
1. Vortex crushing cavity: The structure of the vortex crushing cavity is an annular space composed of upper and lower cylinders. The upper and lower cover plates of the lower cylinder have two holes, the upper part is connected to the cylinder, and the lower part is connected to the discharge port. The impeller rotates at high speed in the vortex crushing cavity, and the material can also reside in the vortex crushing cavity to form a material bed. The crushing process of the material takes place in the vortex crushing cavity. The ore bed layer combines the crushing action with the vortex crushing cavity. The wall is separated, so that the crushing effect is limited to the material, and it has a wear-resistant self-lining effect. An observation hole is set on the upper cylinder cover to observe the wear of the wear block at the launch port of the impeller runner and the wear of the top liner of the vortex crushing chamber. The observation hole must be tightly sealed when the crusher is working. The distributor is fixed on the upper cylindrical section of the vortex crushing cavity. The airflow generated by the high-speed rotation of the impeller passes through the distributor and the impeller in the vortex crushing cavity to form an internal airflow i self-circulation system.
2.Base: The vortex crushing chamber, main shaft assembly, motor, and transmission device are all installed on the base. The middle of the base is a quadrangular prismatic space for installing the main shaft assembly, and a discharge channel is formed on both sides of the quadrangular space. . The dual motors are installed on the longitudinal ends of the base. The base can be installed on the bracket or directly on the foundation.
3.Support: According to the different working places of the crusher---open operation or indoor operation, the user can consider configuring the support or not. ⑼Lubrication system: Molybdenum disulfide dry oil is used for lubrication. The lubrication parts are the upper and lower bearings of the main shaft assembly. In order to facilitate oil filling, the machine uses oil pipes to lead the oil cup to the outside of the machine, and use a dry oil pump to regularly refuel. Have a general understanding of the factors that affect the production capacity of impact crushers.
equipment name | rendering pre-breaker |
equipment brand | Jiangsu SunRise |
produced place | Jiangsu |
motor brand | Simens |