Generator Testing 250Kw Resistive Portable Load Bank color Choose
Product Description
1. Supply most robust, high-capacity designs
2. intelligent operator controls,safety indication layouts, adjustable load step resolution, and lightweight designs
3. solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems
Technical Parameter
Rating Voltage/Frequency | 415VAC/50Hz, 3 phase 4 wire line phase voltage 240V |
Rated Power | Resistive load:250kW |
Installed Capacity | Resistive load: 250kW |
Load Step | 1,2,2,5,10,10,20,50,50,100kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 3 phase 415VAC 50Hz |
Wire Connection |
Load power supply input——Copper bar (star coupling “Y”) Control power supply input——Connector-bar |
Insulation | F |
Way of Working | Continuous Working |
Casing Dimensions and Cooling | about 1600mm×900mm×1500mm (length*width*height) Forced air cooling,Horizontal inlet air and vertical cooling |
Weight | About 600kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing, also the wheel casters can be provided |
Casing Color | Grey(RAL7035)or as you required |
Workplace | Outdoor |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤2500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advangent
(1) Load bank testing: User could load any power within rated power, can test stable state three-phase voltage, current, active power, reactive power, apparent power, power factor, frequency, running time of generating set.
(2) Control Mode: local, remote or intelligent control(software) for choosing.
(3) Local Control: local control panel with several power steps, load or unload by switch on-off and read parameter values from measuring meter.
(4) Remote Control:through the switch in the remote control box, control the load over a long distance.
Application:
As the generator loading system
Periodic running test for standby generator
UPS inspection and maintenance
Ship battery charging/discharging system testing
The acceptance of new system and testing of servicing equipment