Ocean Engineering Dummy Electrical Load Bank 1440KW Generator Test
Product Description
The system consists of 1 sets of 1440kw load bank. The system is made up of two parts of measurement and control and load, mainly including the dry type ac load, automatic data acquisition system, automatically loading and unloading control system, the cooling device, auxiliary control, remote control box and PC software and so on.
Technical Parameter
Rating Voltage/Frequency | 480VAC/60Hz, 3 phase 4 wire, line |
Max Rated voltage | 504V 60HZ |
Rated power | 1440kW |
Load Step | A Phase 10,20,20,,20,50kw B phase 10,20,20,,20,50kw C phase 10,20,20,,20,50kw |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC/50Hz, 3 phase 4 wire, |
Wire Connection | Load power supply input——Copper bar (star coupling) Control power supply input——Connector-bar |
Insulation | F |
Protection Grade | IP21 |
communication interface | RS485,RS232 |
Casing Dimensions and Cooling | about 2800*1900*2400mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling |
Weight | About 1800kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤2500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
1. Manual load: input power and power factor.
2. Automatic load: User can set several periods of power and time, and in turn of 0%→25%→50%→75%→100%, etc preset order to make automatic load testing.
3. Parallel testing: when several load banks parallel working, parameters of each load bank can be displayed and recorded, so do the final parameters of paralleling working.
4. Real-time parameter: Current, voltage, power, power factor, frequency, time, etc could be displayed by software.
Application
Load banks may be installed in a diesel powered generator set to apply the additional load required to ensure the engine fully consumes the fuel in the combustion process. If a diesel engine is not operated under adequate load, unconsumed fuel will collect in the engine’s exhaust stack and form an oily coating.