Generator Dummy Load AC 1000kw Load Bank To 5MW With High Accuracy Electrical
Product Description
It offers the most robust, high-capacity designs in the industry. It is setting the standard with intelligent operator controls, safety indication layouts, adjustable load step resolution, and lightweight designs. It is the perfect solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems.
Technical Parameters
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Rated Load Power | Resistive load: 1000kW |
Installed Capacity | Resistive load: 1000kW |
Load Step | 1,2,2,5,10,20,20,50,100,200,200,200,200kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC/50Hz, 3 phase 4 wire, |
Wire Connection | Load power supply input——Copper bar (star coupling) |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 1680*2400*1440mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 1200kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
Communication type: through RS232, RS485
Load mode: manual load or automatic load.
Manual load: input power and power factor.
Automatic load: User can set several periods of power and time, and in turn of 0%→25%→50%→75%→100%, etc preset order to make automatic load testing.
Parallel testing: when several load banks parallel working, parameters of each load bank can be displayed and recorded, so do the final parameters of paralleling working.
Real-time parameter: Current, voltage, power, power factor, frequency, time, etc could be displayed by software.
Application
Load Banks are used with Engine Generators, Battery Systems, UPS Systems, Inverters, Ground Power Units, Auxiliary Power Units, Aircraft Power Generators, Wind Generators, and Hydro Generators.
It is used with Engine Generators, Battery Systems, UPS Systems, Inverters, Ground Power Units, Auxiliary Power Units, Aircraft Power Generators, Wind Generators, and Hydro Generators.