Stick On Insulation Pins are used widely in industries like Heating, Ventilation and
Air Conditioning (HVAC) Systems.
They are used in external thermal insulation and internal acoustic liner onto the duct surface.
The pin has a sticker backing to make fixing easier.
They also have a unique easy- peel adhesive backing design so that there isn’t any fumbling
with the release paper.
| ||||||||||||||||
|
COMPOSITION: Pin: The pin is made from 12 gauge annealed low carbon steel. (Available in copper coated, aluminum, or stainless steel.) Base: 2" x 2" (50x50mm) square plate made from glavanized steel. Adhesive foam: 1mm thick double sided foam with release paper.
TEMPERATURE RANGE: 0ºF to 140ºF
LOAD LIMIT: 2lbs per hanger
AVAILABLE SIZES: Lengths from 3/4" up to 10" (19mm-250mm)
COMMON Length: 1-5/8": commonly used for 1-1/2" .75# fiberglass duct wrap 2-1/2": used for fiberglass duct wrap over 1-1/2" thick
RESTRICTIONS: 1. Do not use on metal buildings or ceilings where temperatures due to sunlight exposure may exceed 140ºF 2. Do not use on cement, wood, or painted surfaces 3. Must be used on clean dust-free surfaces. 4. Do not exceed spacing of 12" between hangers and 2lb load per hanger.
|
![]() |
1. Stick On Insulation Pins can only be stuck on clean, dry and smooth surface.
2. Remove any duct, loose paint, oil etc. Cleaning the surface is recommended.
3. Peel off the backing paper.
4. Place the stick on insulation pins in the required position.
5. Press the base against the cleaning surface.
6. Impale the insulation over the point of the stick on insulation pins.
7. Secure the insulation with the self locking washers
8. Bend or remove excess pins
1.We choose the best quality materials for making insulation fasteners
2.We do copper plating, zinc coated and phosphating pretreatment for the raw material using
drawing machine.
3.We purchase the multi-station cold forging machine to ensure the better mechanical property
of shear connector to match the standard (BS EN ISO13918:2008, AWS D1.1, etc.),
or as per customer's special requirement.
4.We use the automatic riveting machine to install .
5.After rust prevention, XIANGYI insulation fasteners can suitable for long time ship on the sea.
6.Short delivery time because of our reasonable production flow management.