Product Description:
Part Number | SC-TS-4.8X4 |
Part Type | SMD Switch |
Rating | DC12V 50mA |
Manufacturer | Original Manufacturer |
Contact Resistance | ≤0.03mΩ |
Operation Temp | ‘-20℃ ~ +70℃ |
Electrical Life | 100,000 Cycles Min |
Operating Force | 1.8N-2.8N |
Dielectric Strength | AC250V(50/60Hz for 1minute) |
Enviroment humidity | -25-+70°C |
Relative humidity | (40°C)≤95% |
Insulation Resistance | ≥100mΩ |
Voltage withstand | AC250V 50Hz/min |
Push knorb height size | Can be choosed H=1.5/3.0/3.5/4.0/4.3/4.5/5.0mm |
Welding Conditions | Hand Soldering 350℃ Max 3s Max |
Condition for Reflow 260℃Max 5s Max | |
Welding time(seconds) | 3S |
Welding capacity | 60W max |
Dielectirc Voltage Proof | 250V AC (50HZ/60HZ) 1min |
About us
CSCE Technologies is a professional manufacturer and supplier served in design, production, sale and distribution of more than 1000+ high quality fiber optic products for global optical communication, with its headquarter in Zhejiang, China.
With our advanced production facilities and experienced engineering team who are mostly background from worldwide leading companies for years in the fiber optic field, it ensures us the excellent quality products under the fast delivery, and provides our customers the most suitable solution for their unique project application.
At CSCE, we keep thinking how to serve better and exceed our customers' needs with understanding they are the essential of our success. CSCE is serving our global clients through China local team and global local partners for global communication network market. We are expecting to work with you for a win-win ahead.
Factory
• We have over 3000 workers.
• The area of Yueqing is 1800,000 square meters.
• Yueqing Shichuang Electronics Co.,Ltd have owns 3 factory in Yueqing,Shenzhen,Jiangxi.
Quality
• Lean production management.
• 100% Tested (Not Just Batch Tested).
• Quality Guarantee:5 Years.
Certification
• ISO 9001:2000,
• ISO14001
• Active Environmental Policy.
FAQ
*Q: Can I get samples from you?
A: We are honored to offer you samples for quality check.
*Q: What parts are manufactured by you?
A: All of frame parts are manufactured by us.
*Q: What's the leading time? (How long do you need to prepare my goods?)
A:5 days for sample orders. 15 days for mass production orders (based on different quantities)
*Q: How long do I need to wait before my goods arrive?
A: 3-5 days for international express. 5-7 days for air transportation, 15-30 days for sea transportation.
Product Drawing: