Large Scale Seawater Desalination Equipment Industrial Salt Water Treatment Plant
Reverse osmosis equipment operation Boot
1. Check the electrical appliances and pipelines to ensure that the original water tank has water; Water treatment equipment pp cotton Soft water equipment
2. Open the water source switch before the water solenoid valve
3. Open [Flush Solenoid / Auto], [Original Pump / Auto], [High Pressure Pump / Auto], [Total Power / ON].
4, the system starts automatic operation Water treatment equipment pp cotton Soft water equipment
Shutdown: Water treatment equipment pp cotton Soft water equipment
Open [Flush Solenoid / Manual] and rinse for 2 minutes.
Hit [total power / off]
Hit [flushing solenoid valve / automatic] water treatment equipment pp cotton soft water equipment
Manual flushing of reverse osmosis equipment membranes:
Flushing: Make sure that the original water tank has water and water is filled in. Open [flushing solenoid valve / manual]
Rotate to [original pump / manual] [high pressure pump / manual]
Rinse for a suitable time and then turn to [original pump / stop] [high pressure pump / stop] [flush solenoid valve / stop] water treatment equipment pp cotton soft water equipment
Reverse osmosis equipment detail pictures :