Specifications
Brand Name :
Wage
Model Number :
HG TP
Certification :
EMS, OHSMS
Place of Origin :
China
MOQ :
1 ton
Price :
FOB 1800- 1900 USD per ton
Payment Terms :
L/C, T/T, Western Union, MoneyGram
Supply Ability :
20 tons per week
Delivery Time :
1- 3 weeks
Packaging Details :
White PE bag,N.W.10kg/bag. 1000kg/pallet.
Main :
modified asphalt
Color :
black
Type :
thermoplastic
Apperarance :
Granules
Operation Melt temperature :
280°C
Curing Time :
5-8 minutes
Description

Asphalt Road Patching Material For Pothole repair

Thermoplastic asphalt road repare patching materialModified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

General Description

This material is an elastic repair material, composed of modified asphalt, chalk powder, polymer materials, quartz sand, rubber powder, and other materials mixed with special additives.

Special for hot-applied, aggregate-flled, polymer-modifed asphalt pavement repair mastic, used for repairing distresses in asphalt .

Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

Product Specifications

Item Range
Apperarance Granules
Color Black
Operation Melt temperature 280°C
Curing Time 5-8 minutes

Application:

* Filling wide cracks and joints

* Filling potholes

* Road reticular crack repairing

* Pretreatment of fatigue cracked are prior to surface maintenance

* Repairing and Leveling manhole covers

* Leveling bridge deck approaches

* Repairing deteriorated longitudinal joints such as tramcar

* Filling spalls, popouts,and breaks, etc

Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

Packaging

White PE bag,N.W.10kg/bag.

1000kg/pallet. 1.2*1.0*1.0M size for pallet

Storage

The product can be stably stored for at least one year when kept in a dry place at temperature below 30°C.Avoid exposure to direct sunlight.

Using step

1.Clean the moisture and dust in the area to ensure they are dry and clean

2.Use a thermoplastic boiler to heat the elastic asphalt patching material to 280 ℃

3.Choose different widths of coating scoop based on the size of crack or other damage

Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

Caution

When the material is melt will keep a high tempreture on itself and machine or tools, pls mind the scald

Contact

Rita QU

Xi'an Wage Traffic Infrastructure Installation Co.,LTD
Mail: wagetraffic@hotmail.com Cell/ Whatsapp: +86 15591818803
Add:Room 401, Unit 2, Bilding 2, Shenglong Plaza, Weiyang Road, Xi'an, 710016, Shaanxi, China
Send your message to this supplier
Send Now

Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

Ask Latest Price
Brand Name :
Wage
Model Number :
HG TP
Certification :
EMS, OHSMS
Place of Origin :
China
MOQ :
1 ton
Price :
FOB 1800- 1900 USD per ton
Contact Supplier
Modified Asphalt Patch Material Pothole Filling Materials 5-8 Minutes

Xian WAGE Traffic Infrastructure Installation Co., Ltd.

Verified Supplier
2 Years
Shaanxi
Since 2010
Business Type :
Manufacturer
Total Annual :
1000000-5000000
Employee Number :
50~80
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement