15 Meters Per Minute Standing Seam Roll Forming Machine Roofing Forming Machine
1.Application of Standing Seam Roll Forming Machine:
This machine final products is the roofing panel ,we can build different size roof panel, it is very easy to operate and change size, it is very portable and easy operation Machine.
Color steel tile has the good characteristics, such as lightweight, high strength, colorful, easy installation, anti-seismic, fire-proofing, rain-proof, long service life, maintenance-free, etc. Now, it is widely popularized and used. This machine is suit for the production of various kinds of color steel tiles.
Our factory products with rational structure, good looking and duration, have been exported to Uganda, Uruguay, Nigeria, Ghana, Vietnam, Myanmar, Russia, Kazakhstan, Ausstralia, Philippines etc.
2.Main componets of Standing Seam Roll Forming Machine:
No. | Name | Unit | Qty |
1 | Decoiler | set | 1 |
2 | Main Machine for roll forming | set | 1 |
3 | Cutting System | set | 1 |
4 | Output Table | set | 1 |
5 | Control System(PLC) | set | 1 |
6 | hydraulic station | set | 1 |
3.Machine picture of Standing Seam Roll Forming Machine:
4.Machine specification of Standing Seam Roll Forming Machine
Machine Specifications | |
Weight | About 1.25tons |
Size | About 2.2*1.15*1.3m(length x width x height) |
Color | Main color: blue or as your requirement |
Material | Color Steel Coils |
Thickness | 0.3-0.7 mm |
Yield Strength | 235Mpa |
Quantity of forming rollers stations | 8 |
Diameter of forming rollers shafts | 70mm |
Roll Forming Speed | 10-15m/min |
Forming rollers material | No.45 steel, coated with chromed treatment |
Cutter material | Cr12 steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric Power requirement | Main motor power: 2.2kw hydraulic motor |
5.Our service
A. Foreign debugging
If you need, we will arrange our professional engineers to help you install and debug the machines well. Buyer should pay $60 per day
B. Guarantee period
The warranty will be maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts free of charges, which is in the conditions of correct operation. (Natural disasters or factors which can’t forced by human are excluded).
C. Training
During installation and adjustment of the equipment, our engineers shall provide the training to
buyer’s personnel request to operate and maintain the equipment. Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc.
D. Lifetime services
Life time services to every customer.