JCX Fast Speed Metal C track U stud Omega Profile Roll Forming Machine With High Quality And Best Price
1. Introduction of stud and track roll forming machine
2. Technical details of stud and track roll forming machine
No. | The main parameter of drywall metal stud and track roll forming machine | |
1 | Production | CD 60 27;UD 27 23 |
2 | Roller station | 12 rows |
3 | Dimensions | 4500*800*800mm |
4 | Power | 4KW |
5 | Thickness of the plate | 0.3-1.0mm or 0.6~1.2mm |
6 | Productivity | 25m/min |
7 | Middle plate thickness | 20mm |
8 | Diameter of shaft | 45mm |
9 | Diameter of roller | 100mm |
10 | Weight | About 3T |
11 | Voltage | 380V 50Hz, 3 phase |
12 | Cutter Material | Cr12 |
13 | Roller Material | GCr15 |
14 | Transmission | Gear-chain |
3. Main components of stud and track roll forming machine
Components for stud and track roll forming machine | |||
Name | Quantity | Units | |
Decoiler | 1 | Set | |
Main Machine | Feeding device | 1 | Set |
Roll forming system | 1 | Set | |
Cut Equipment | 1 | Set | |
Hydraulic system | 1 | Set | |
Electric control system | 1 | Set | |
Supporter/Automatic Stacker | 1 | Set |
4. Production Flows of stud and track roll forming machine
Uncoiling the sheet---Roll forming---Rectifying the straightness---Measure length---Cutting the panel--panels to the supporter (option: automatic stacker)
5. Installation service
a. After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
b. Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.
c. The buyer should arrange the accommodation, food, and traffic in the destination
d. Training period: 2 days. (we can supply training on the operation spot if buyer needs)
6. Application of stud and track roll forming machine
The advantage of final products C U Keel includes beautiful, classical appearance and grace taste. It is widely used in village, hotel, exhibition, vacation village, family construction and outdoor decorating.
7. Product photo of of stud and track roll forming machine
8. Our service
1. Product quality control and delivery time is strictly controlled;
2. Direct manufacturing factory offering competitive price;
3. All the inquiries will be replied within 12 hours;
4. OEM & ODM service are available;
5. Providing first-class after-sales services to the customers.
9. Installation and training:
If buyers visit our factory and check the machine, we will teach you how to install and use the machine and also train your workers/technician face to face.
Without visiting,we will send you user manual and video to teach you to install and operate.
If buyer needs our technician to go to your local factory, our engineers can go to your place to make the installation
10. After-sell service
Guarantee period
The warranty period is 18 months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts free of charges, which is in the conditions of correct operation. (Natural disasters or factors which can’t forced by human are excluded).
Foreign debugging
If you need, we will arrange our professional engineers to help you install and debug the machines well. Buyer should pay $100 per day