T BAR ROLL FORMING MACHINE CEILING GTID CHANNEL ROLL FORMING MACHINE FOR CEILING
1. Description Of T BAR ROLL FORMING MACHINE CEILING GTID CHANNEL ROLL FORMING MACHINE FOR CEILING
We have exported set Ceiling tee grid machines abrod.
The comple t bar line consist of Main Tee roll forming machine+Cross tee roll forming machine+Wall angle roll forming machine
Galvanized ceiling tee grid has the advantages of : light weight, high strength, suitable for waterproof, shockproof, dustproof, sound insulation, sound absorption, constant temperature and other functions, and also has the advantages of short construction period and easy construction.
2. Technical Details Of Ceiling tee grid t bar roll forming machine
(1). Suitable material to process: | PPGI coil and GI coil; |
(2). Thickness of the plate: | 0.27-0.4mm; |
(3). Productivity: | 0-30m/min; |
(4). Roller stations: | 18 rows; |
(5). Diameter of the shaft: | φ40mm; |
(6). Material of roller: | Cr12; |
(7). Material of main shaft: | 45# steel with grinding process and then slack quench processed; |
(8). Frame: | square box structure welded with steel; |
(9). Wall structure: | independent style and thickness 30mm; |
(10). Main motor brand: | Shanghai popular brand; |
(11). Main motor power: | 5.5KW; |
(12). Hydraulic station power: | 15KW, with Nitrogen Energy Storage Tank; |
(13). Full auto tracking cutting system, | servo motor 11Kw |
(14) Hydraulic oil cooling machine | 2.2kw |
(15). Main electrical control system: | Xinjie PLC, Delta frequency changer & touch screen, Omron counter; |
(16). Material of cutter: | Cr12MoV with hard treatment; |
(17). Driving mode: | gears; |
(18). Punch with mould: | two sets, one punch with 0.75KW servo motor feeding ; |
(19). Power supply: | 380V, 50HZ, 3 PHASES, or customized; |
(20). Main machine weight: | about 3 tons; |
(21). Full line required space: | 15m*1.5m(L*W) |
(22). Runout table | 3m/pcs |
(23). Uncoiler | 2tons, 2 sets |
(24).Air dryer | 1 set |
3. Main Components Of
T BAR ROLL FORMING MACHINE CEILING GTID CHANNEL ROLL FORMING MACHINE FOR CEILING
Manual Decoiler-3tons | 1 Set |
Guiding device | 1 Set |
Main Roll Forming Unit | 1 Set |
Post Cutting Unit--Non-stop | 1 Set |
Hydraulic Station | 1 Set |
PLC Control System | 1 Set |
Punching system | |
Reveiving Table-2m | 1 Set |
4. Production Flows Of
T BAR ROLL FORMING MACHINE CEILING GTID CHANNEL ROLL FORMING MACHINE FOR CEILING
5. Advantages Of Our T BAR ROLL FORMING MACHINE CEILING GTID CHANNEL ROLL FORMING MACHINE FOR CEILING
· More than 10 engineers and More than 10 designers with more than 10 years experience
· We have completed production system. And more than 20 sets of CNC machines which can support lots of machine.
· Our machine's warranty period is 12 months and and we supply the technical support for the whole life of the equipment.
·
6. Application Of Ceiling tee grid forming macine
This machine is widely used in the production of the metal roof sheets and wall panel. our machines are exported to many countries: Rwanda, Thailand, Philippines, Dubai, USA, South Africa, Peru, Russia, Saudi Arabia, Malaysia, Indonesia, etc.
7. Product photos Our Ceiling tee grid ceiling channel wall angle roll forming machine
8. FAQ
Q: How to visit our company:
A: 1.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
3. Fly to Guangzhou aiport: By air From Guangzhou to Beijing airtpot; By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Q. How to get a quotation?
A: 1. Give me the profile drawing and the thickness of your material it is very important.
2. If you have requirements for production speed, power, voltage and brand, please explain in advance.
3. If you don't have your own profile drawing, we can recommend some models according to your local market standard.
Q. What's your payment terms and delivery time?
A: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable. After we get down payment, we will arrange production. About 30-45 days for delivery.