12-15m/min Portable Downspout Machine Hydraulic Mould Cutting For Steel Downpipe
1. Application of downspout roll forming machine:
Metal downspout is made by using the color steel or GGPI coils roll-pressing and end-closing, then use the special equipment hit-to-bend and necking.
Metal drainage system has the excellent weather fastness. It has the advantages such as simple design, easy installation, safe and durable, elegant. It is widely used in the modern villas and multiple raises buildings.
Our factory is producing the high quality downspout roll forming machines and export to India, Bangladesh, Vietnam, Turkey, etc.
2. Production Flows of downspout roll forming machine
Uncoiling the sheet---Infeed guiding--Roll forming---Rectifying the straightness---Measure length---Cutting the panel--panels to the supporter (option: automatic stacker)
3. Main components of downspout roll forming machine
Decoiler | 1 Set |
Guiding Equipment | 1 Set |
Roll Forming Unit | 1 Set |
Post Cutting Unit | 1 Set |
Hydraulic Station | 1 Set |
PLC Control System | 1 Set |
Reveiving Table | 1 Set |
4.Technical details of downspout roll forming machine:
Machine Specifications | |
Weight | About 5000kgs |
Size | About 11m x 1.2m x 1m (L x W x H) |
Color | Main color: blue |
Warning color: yellow | |
Main Technical Parameters | |
Quantity of forming rollers stations | 20-22 |
Diameter of forming rollers shafts | 60mm |
Roll Forming Speed | 8-12m/min |
Forming rollers material | No.45 steel, coated with chromed treatment |
Cutter material | CR12 mould steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric Power requirement | Motor of roll forming machine: 5.5kw |
Motor of sawing cutter: 3kw | |
Motor of elbow machine: 1.5kw | |
Electric voltage | According to customer’s requirement |
5. Advantages
· Germany COPRA software design
· 5 engineers with more than 20 years experience
· 30 professional technician
· 20 sets advanced CNC production lines on site
· Passionate Team
· Installation engineers can reach your factory within 6 days
· 1.5 years maintenance and whole life technical support
6. Product photo
7. Installation service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)